Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2024 at 8:00 PM

Updated May 16, 2024

Site work and paving for a road / highway in Hughesville, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnish and place approximately 233 tons of 19.0 mm Asphalt Binder Crse; Perform approximately 21 CY of roadway mill/excavation; Furnish and install approximately 45 LF of PE Pipe; Furnish and install 1 Ea standard inlet; Perform approximately 53 tons of 19.0 mm shoulder repair. Performance bond and payment bond in the amount of 100% of the contract, as well as proof of worker's compensation insurance will be required from the lowest responsible bidder. All work and material must meet current Pennsylvania Department of Transportation Specifications Form 408 and its Supplements. Proposals must be upon the forms furnished by the Municipality. The Municipality reserves the right to reject any or all proposals. Superpave Asphalt Mixture Design, Binder Course, PG 64S-22, < 0.3 million ESALS, 19.0 MM Mix, SRLANY. Furnish and place Asphalt Binder Course at the listed above compacted depth across the entire crosssection of the roadway. Completed pavement shall provide a cross-slope of 2.0% to maintain positive drainage throughout construction and positive drainage into all existing cross pipes and inlets. • Placement of asphalt paving includes the paving of roadway intersection radiuses. • Contractor shall coordinate all paving work on Strawbridge Road with seal coat contractor to ensure work is completed prior to seal coat operations. This work is the removal and replacement of existing pipe and the new installation of PE Polyethylene Pipe. Backfill with 2A Subbase and compact according to PennDOT 408 Spec and finish the trench with paving (Place 4” Depth of Superpave asphalt 19.0 mm, 0.0 to 0.3 million ESAL’s. The contractor will provide all necessary excavation, bituminous material, subbase, as needed to complete this work. The contractor will complete all work, providing necessary labor, equipment and material needed to complete work which is to be verified by Penn Township representative. Contractor will be responsible for any engineering/surveying required to provide the proper elevations and alignments are established for the pipe installation so that proper water flow is maintained. All work must be completed in accordance with current PennDOT Publication 408 Specifications and its supplements.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
107
Bidding Soon
2,267
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

Project location map

Multiple Locations, Hughesville, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed