BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Weston, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work for which bids are asked includes the following: Project A - Weston Avenue Reconstruction (Alderson Street to Birch Street) - Approximately 2,775 LF including a compact roundabout. Project B - Alderson Street Reconditioning (Weston Avenue to Summit Avenue) - Approximately 570 LF including ditching on south side of roadway. Project C - Summit Avenue (Wall Street to Alderson Street) - Approximately 1,275 LF. Project D - Village of Weston Utilities (Summit Avenue Watermain Replacement, Alderson Street Watermain and Sanitary Sewer Replacement, Weston Avenue Watermain). Work includes underdrain, concrete storm sewer inlets & manholes, HDPE storm sewer pipe & culverts, unclassified excavation, select crushed, base aggregate dense, HMA pavement, concrete driveway & sidewalk, curb and gutter, pavement marking, signing, and restoration. Utility work includes ductile iron watermain, hydrants, PVC sanitary sewer and concrete sanitary manholes. Est. Completion Date: Nov. 22, 2024 The anticipated substantial completion date is November 1, 2024 and final completion date is November 22, 2024. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 146 North Central Avenue, Suite 201, Marshfield, WI 54449. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Project A - Weston Avenue Reconstruction is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP) - MSIS. Project C - Summit Avenue is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP) - MSILT. OWNER reserves the right to waive any informalities or to reject any or all bids. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Roads / Highways

$2,624,159.00

Public - City

Paving, Site Work

188

19

18

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
22
Bidding Soon
828
All Active Projects
210
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 15, 2024

June 14, 2024

November 22, 2024

img_map_placeholder

Multiple Locations, Weston, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.