BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2025 at 8:00 PM

Updated March 11, 2025

Site work and paving for a mixed-use development in Weston, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Question Deadline 03/03/2025 Questions received less than seven days prior to the date for opening of Bids may not be answered. The project consists of the removal of concrete pavement, concrete curb and gutter, and concrete sidewalk as well as the installation of sanitary sewer, water main, storm sewer, sidewalk, curb ramps, curb and gutter, driveways, concrete pavement, asphalt pavement, pavement marking, restoration, traffic signals, construction staking, and traffic control. The project is funded in part by the Wisconsin Department of Transportation Local Road Improvement Program (LRIP) - MSIS. Bid security shall be furnished in accordance with the Instructions to Bidders. Bids will be accepted only from Bidders prequalified by the Owner. Contact Christopher Beyer, PE at 262-842-2415 for information regarding this project or prequalification requirements. If you have any questions regarding the registration or the download process, please contact the Owner Representative

Bid Results

Roads / Highways

$6,248,726.00

Public - City

Paving, Site Work

141

16

28

8

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
54
Bidding Soon
372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

Project location map

Schofield Ave, Weston, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.