BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in South Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Park Avenue (N Chicago to Lake) Pavement Rehabilitation & Sewer Work consists of the following items for work: Asphalt Milling (Full Depth) 4,600 S.Y., Asphalt Milling (2") 3,600 S.Y., Asphalt Base 710 TON, Asphalt Surface 940 TON, 24" Curb and Gutter (Machine install) 3,000 L.F., Concrete sidewalk, service walks and curb ramps 4,400 S.F., Concrete curb pedestrian 22 L.F., Driveway Approaches 200 S.Y., Storm sewer 8" pipe 230 L.F., 2x3 curb inlets 4, Storm sewer 3-ft diameter manhole 1, Backflow preventer (8") 1 and other miscellaneous quantities of traffic control, concrete sawing, crushed aggregate base and unclassified excavation. Items applicable to the above work is in the contract documents. Questions pertaining to receiving document sets should be directed to Lynda Wolak at lwolak@smwi.org or (414) 762-2222, Any questions regarding qualifications shall be submitted to the City Engineer. If any person contemplating submitting a Bid for the proposed contract is in doubt as to the true meaning of any part of the plans, specifications or other proposed contract documents, they may submit to the City Engineer's office a written or verbal request for an interpretation thereof by contacting: Genevieve Stollenwerk, City Engineer Phone 414-762-2222 ext. 136 Fax 414-768-8068 e-mail: gstollenwerk@smwi.org The document set describes items and final quantities for each bid proposal. It is anticipated that contracts will be awarded by the South Milwaukee Common Council on May 21, 2024. Utility work consisting of water lateral replacements shall be completed by June 30, 2024 and the work for this project by November 1, 2024, unless otherwise allowed by the City Engineer. Est. Completion Date: Nov. 1, 2024 Pre-Qualification: Yes Site Directions: Park Avenue (N Chicago Avenue to Lake Drive) City of South Milwaukee, Wisconsin

Post-Bid

Roads / Highways

$5,000,000.00

Public - City

Paving, Site Work

33

7

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
67
Bidding Soon
1,518
All Active Projects
657
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

July 15, 2024

img_map_placeholder

Park Ave, South Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.