Site work and paving for a mixed-use development in South Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
13th Avenue Pavement Rehabilitation Drexel to Rawson consists of the following items for work: Concrete Curb & Gutter (Hand set) 2,900 L.F., Concrete Driveway Approach 400 S.Y., Concrete Sidewalk & Service walk 9,300 S.F., Concrete Curb Ramp 1,900 S.F., Asphalt Pavement Milling 14,000 S.Y., Asphalt Surface 1,400 TONS, Asphalt Base 2,100 TONS and other miscellaneous quantities of unclassified excavation, base aggregate, and saw cutting. Items applicable to the above work is in the contract document. The document set describes items and final quantities for each bid proposal. It is anticipated that contracts will be awarded by the South Milwaukee Common Council on June 4, 2024 and the work for this project completed by November 1, 2024, unless otherwise allowed by the City Engineer. Utility work under a different contract shall be completed by July 12, 2024. Site Address: 2424 15th Avenue Site Directions: 13th Avenue (Drexel to Marquette) and 13th Avenue (Milwaukee to Rawson), South Milwaukee Wisconsin Est. Completion Date: Nov. 1, 2024 Pre-Qualification: Yes Proposals must be placed in a sealed opaque envelope addressed to : "City Clerk, City of South Milwaukee, Wisconsin" and marked "13th Avenue Pavement Rehabilitation Drexel to Rawson and 4th Avenue Pavement Rehabilitation Michigan to Menomonee (Alternate - A)". If the bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "Sealed Bid Enclosed" on the face thereof. This item consists of removal and disposal of existing asphalt pavement as shown on the plans and as determined necessary for roadway rehabilitation and utility reconstruction. Existing pavement section on 13 th Avenue from (Drexel to Marquette) is 2 1/2” to 4 ½” asphalt over 3” to 15 ½” pulverized material (previously pulverized asphalt, stone, and soil mix). The existing pavement section on 13 th Avenue (Milwaukee to Rawson) is an overlayed pan and 3” to 4 ½” asphalt over 8 ½” to 15” pulverized material. Existing pavement section on 4 th Avenue from (Michigan to Menomonee) is 2 1/2” to 5” asphalt over 4 ½” to 13 ½” pulverized material (previously pulverized asphalt, stone, and soil mix). The existing subgrade material shall be re-used after milling/profiling by minor grading, shaping, and compacting and is included in this item. The subgrade shall be graded to 4% maximum cross slope from gutter flange to the centerline and roller compacted. (To allow for 4.5” asphalt paving and 4% maximum cross slope, the mill depth will vary from 4.5” at curb flange and 5.5” at centerline.) Following proof roll, any over-excavation of subgrade and placement of new stone base shall be performed under Item No. 7 Excavate and Fill Subgrade.
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 29, 2024
June 28, 2024
Multiple Locations, South Milwaukee, WI
Related To This Project
South Milwaukee, WI
Bid Date: May 29 2024
South Milwaukee, WI
Bid Date: Jun 05 2024
South Milwaukee, WI
Bid Date: Sep 11 2024
South Milwaukee, WI
Bid Date: Oct 10 2024
South Milwaukee, WI
Bid Date: Nov 21 2024
South Milwaukee, WI
Bid Date: Jan 07 2025
South Milwaukee, WI
Bid Date: Jan 07 2025
South Milwaukee, WI
Bid Date: May 29 2024
South Milwaukee, WI
Bid Date: May 16 2024
South Milwaukee, WI
Bid Date: Feb 15 2024
South Milwaukee, WI
Bid Date: Apr 11 2024
South Milwaukee, WI
Bid Date: Jan 10 2024
South Milwaukee, WI
Bid Date: Jan 10 2024
South Milwaukee, WI
Bid Date: Dec 05 2023
South Milwaukee, WI
Bid Date: Mar 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.