Published May 22, 2024 at 8:00 PM

Updated May 23, 2024

Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

2024 Lead Service Line Replacement Equity Prioritization Program All work, including site restoration, must be completed by December 27, 2024. Liquidated Damages, per diem: $935.00 The SBE requirement for this project is 25% of the contract base bid. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, filter distribution (contractor to obtain filters from MWW), traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, codecompliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. The contractor will be required to complete a minimum of 2 service replacements per working day. Project locations will be as shown on the project Site Map and the contractor may be assigned replacement projects in one (or more) of the numbered work areas. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement - Equity Prioritization Program. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations.

Award

Water / Sewer

$2,492,900.00

Public - City

Site Work

3

3

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
91
Bidding Soon
1,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

June 3, 2024

Project location map

Multiple Locations, Milwaukee, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.