BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2024 at 8:00 PM

Updated September 10, 2024

Site work for a parking garage in Cambridge, Massachusetts. Completed plans call for site work for a parking garage.

Cambridge Housing Authority, in its capacity as managing member, acting on behalf of Washington Elms LLC, the Owner and Awarding Authority, invites sealed bids for Washington Elms Site Improvements Project, at 100 Harvard St. in Cambridge, MA, in accordance with the documents prepared by Hill-LiRo, Corp., 529 Main St., Suite 3303, Boston, MA 02129. The project consists of Site Improvements including landscape changes and repair of an existing brick retaining wall. The Work of Project is defined by the Contract Documents prepared by Hill-LiRo, Corp. and generally consists of the following: 1. Protection, maintenance, and care of all existing trees indicated to remain. 2. Demolition of existing structures and paved areas, site improvements, including removal or abatement of hazardous materials. 3. Repairs to existing brick retaining wall. 4. Site preparation and ground improvement to support new structures and landscaping. 5. Improvements to site, including new drives, walkways, site improvements and landscaping. 6. Other Work as indicated in the Contract Documents. TIME A. In accordance with the Agreement, the Contractor shall bring the work to Substantial Completion within 90 calendar days (3 months), and to Final Completion within 120 calendar days (4 months).

Award

Parking Garage

$150,000.00

Public - City

Site Work

8

15

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
537
Active Projects
199
Bidding Soon
4,142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2024

June 24, 2024

Project location map

100 Harvard St, Cambridge, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.