EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Renovation of a mixed-use development in Sacramento, California. Completed plans call for the renovation of a educational facility.

**As of June 21, 2024 project was awarded but awarded amount is not available.** Send inquiries to: Capital Program Management, Inc. – James Watson 1851 Heritage Lane, Suite 210, Sacramento, CA 95815 (916) 553-4400 Office Phone – jamesw@capitalpm.com The Project consists of New Cabling and Pathway to support new cameras. Security Cameras and Network Servers are Owner Furnished/Owner Installed and not part of this contractors scope of work. (Refer to Exhibit E Special Provisions, Section 1.03 Scope of Work.) . If the Contractor does not agree that work due to an interpretation or supplemental drawing or instruction is within the scope of the Contract Documents, the Contractor shall, within seven (7) days after receipt of the interpretation or instruction, submit a Proposed Change Order to the District Representative specifying in detail in what particulars the contract requirements were exceeded and the resulting change in cost. The District Representative shall then determine 3whether a Change Order shall be issued. The Contractor shall perform such work without delay.

Award

Educational

$125,000.00

Public - City

Renovation

30

11

9

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Closeout Submittals, Bonds
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
74
Bidding Soon
1,543
All Active Projects
659
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

June 17, 2024

img_map_placeholder

Multiple Locations, Sacramento, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.