Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a service station / car wash facility in Saint Paul, Minnesota. Completed plans call for site work for a service station / car wash facility.
A. The work will done under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. Project will install both new and replacement Electric Vehicle Charger at various locations throughout the Capitol Complex. Locations include two (2) Level III EV chargers on Sherburne Avenue, just south of Lot Q. Replace and add new Level II chargers in the Administration Building Ramp. Add new Level II chargers at the Motor Pool area of the Transportation Building. Add new Level II chargers in the Retirement Services Building ramp. Add new Level II chargers in the Judicial Building garage as an add alternate. New and modified electrical distribution will be provided to connect to these chargers. The Section 00 41 73 Prime Contractor Response Form, which includes the attachments listed in the project manual table of contents, is posted within the VirtuBid area of the Online. The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor, the work for at least two (2) contracts which have achieved Substantial Completion since May 1, 2019, for construction for General Contracting that involved similar Project Scope. Each of these contracts MUST have had a construction value of $350,000 or greater. To view the Attachment C Qualification Form where the information above is located, as well as additional qualification requirements, go to the VirtuBid area of the Quest CDN plan room for this project and download the Response Form. All questions should be submitted no later than Friday, May 17, 2024, by 5:00 PM CT. The State is not obligated to answer questions submitted after the question due date and time. Site Directions: Project will install both new and replacement Electric Vehicle Charger at various locations throughout the Capitol Complex. Est. Value: $ 999,100.00 Est. Completion Date: Jan. 31, 2025 SUMMARY OF WORK (SEE SECTION 01 10 00 FOR FULL SCOPE OF WORK) A. The work will be done under one prime contract that includes: Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Project will install both new and replacement Electric Vehicle Charger at various locations throughout the Capitol Complex. Locations include two (2) Level III EV chargers on Sherburne Avenue, just south of Lot Q. Replace and add new Level II chargers in the Administration Building Ramp. Add new Level II chargers at the Motor Pool area of the Transportation Building. Add new Level II chargers in the Retirement Services Building ramp. Add new Level II chargers in the Judicial Building garage as an add alternate. New and modified electrical distribution will be provided to connect to these chargers DESCRIPTION OF ALTERNATES Alternate 1: Install new Level II EV chargers in the Judicial Building garage
Award
Service Station / Car Wash
$639,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
June 24, 2024
Multiple Locations, Saint Paul, MN
Related To This Project
Saint Paul, MN
--
Saint Paul, MN
--
Saint Paul, MN
Bid Date: May 14 2024
Saint Paul, MN
Bid Date: Jun 07 2024
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Jun 12 2024
Saint Paul, MN
Bid Date: Jun 05 2024
Saint Paul, MN
Bid Date: May 15 2024
Saint Paul, MN
Bid Date: May 17 2024
Saint Paul, MN
Bid Date: May 10 2024
Saint Paul, MN
Bid Date: May 09 2024
Saint Paul, MN
Bid Date: May 14 2024
Saint Paul, MN
Bid Date: Apr 24 2024
Saint Paul, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
New Year, New Possibilities. Make the connections you need to kickstart 2025.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.