Site work and paving for a mixed-use development in New Brighton, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Sealed proposals for furnishing of the necessary labor, materials, and equipment for the rehabilitation of approximately 2.54 miles of streets in New Brighton by the removal of the existing bituminous surfacing, reclamation of the existing surfacing, removal and replacement of sections of concrete curb and gutter, storm sewer construction, sanitary sewer replacement, watermain and hydrant replacement, street excavation and grading, aggregate base, bituminous surfacing, concrete sidewalk construction, and boulevard repair which includes approximately: 32,400 SY Remove Bituminous Pavement 10,400 SY Full Depth Reclamation 9,300 CY Common Excavation 14,000 Ton Aggregate Base Class 5 6,800 Ton Bituminous Non-Wear Mixture 4,800 Ton Bituminous Wear Mixture 280 LF Storm Sewer Drainage Structures 1,900 LF Storm Sewer (12" RCP - 42" RCP) 700 LF Sanitary Sewer (8" PVC) 8,800 LF Watermain Replacement 140 EA Water Service Replacement 18 EA Install Fire Hydrant 20,000 LF Concrete Curb and Gutter 5,600 SY Concrete Driveway Pavement 21,200 SF Concrete Sidewalk 1 LS Traffic Control Each proposal shall be accompanied by a Non-Collusion Affidavit; A Responsible Contractor Certificate; an Equal Employment Opportunity Certification; and a certified check or bid bond made payable to the City of New Brighton in the amount of 5% of the bid as a guarantee that such bidder will enter into a contract with said City, in accordance with the terms of such letting and bid in case such bidder be awarded a contract. No bids may be withdrawn for a period of thirty (30) days from the date of opening bids. The right is reserved to accept any bid, or to reject any or all bids. Site Directions: Project Area 1 - From I694 take exit 39 for Silver Lake Road. Go south on Silver Lake Road approximately 1 mile to County Road E. Go east on County Road E approximately 0.25 miles to the intersection with 20th Avenue SW. Project Area 2 - From I694 take exit 40 for Long Lake Road/10th Street NW. Go south on 10th Street NW to the intersection with 8th Avenue NW. Go south on 8th Avenue NW to the intersection with Old Highway 8 NW. Continue south on Old Highway 8 NW to the intersection with 4th Street NW. Est. Value: $ 6,814,000.00 Est. Completion Date: July 31, 2025

Award

Roads / Highways

$5,740,692.00

Public - City

Paving, Site Work

69

6

4

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
46
Bidding Soon
816
All Active Projects
351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

July 22, 2024

img_map_placeholder

Multiple Locations, New Brighton, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.