BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in New Brighton, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Sealed proposals for furnishing of the necessary labor, materials, and equipment for the construction of retaining walls and sidewalk adjacent to Old Highway 8 which includes approximately: 300 CY Common Embankment 70 Ton Aggregate Base 780 SF Modular Block Retaining Wall 710 SF Concrete Retaining Wall 1,800 SF Concrete Walk 230 LF Wire Fence Design Special Each proposal shall be accompanied by a Non-Collusion Affidavit; a Responsible Contractor Certificate; an Equal Employment Opportunity Certification; and a certified check or bid bond made payable to the City of New Brighton in the amount of 5% of the bid as a guarantee that such bidder will enter into a contract with said City, in accordance with the terms of such letting and bid in case such bidder be awarded a contract. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The right is reserved to accept any bid, or to reject any or all bids. Site Directions: From I694 take exit 39 for Silver Lake Road. Go south on Silver Lake Road approximately 1 mile to County Road E. Go east on County Road E to Old Highway 8. Go south on Old Highway 8 approximately 0.10 miles to the project location. Est. Value: $ 462,350.00 Est. Completion Date: Sept. 20, 2024 Project no- S.A.P. 147-020-047,CP 21-9 Direct questions about this Project, including pre-bid questions, to Kyle Imholte, P.E. at kyle.imholte@kimley-horn.com or at 612-294-9732.

Award

Roads / Highways

$394,050.00

Public - City

Paving, Site Work

43

9

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
81
Bidding Soon
800
All Active Projects
314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

June 21, 2024

img_map_placeholder

Old Hwy 8, New Brighton, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.