Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 8, 2025 at 7:00 PM
Updated January 9, 2025
Site work for a water / sewer project in New Brighton, Minnesota. Completed plans call for site work for a water / sewer project.
The project includes the following work on the 300,000-gallon double ellipsoidal reservoir, constructed by Chicago Bridge & Iron Co. in 1955. Date of last reconditioning is unknown. 1. Cleaning, sandblasting, and painting all interior and exterior surfaces. Full containment is mandatory. Site Directions: 700 Silver Lake Road, New Brighton, MN 55112 2. Structure modifications and surface repairs. Tower out-of-service schedule to start on April 28, 2025 and end by June 30, 2025. Est. Completion Date: Oct. 17, 2025 The approximate dimensions are as follows; tank diameter of 43-feet, high-water level 80-feet, low-water level of 50-feet, and overall height of 84-feet.
Award
Water / Sewer
$432,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
