BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Wilton, Iowa. Completed plans call for the renovation of a water / sewer project.

The City of Wilton, Iowa is installing a standby packaged engine generator at the water treatment plant capable of operating the entire water treatment plant during a power outage. GENERAL PROJECT DESCRIPTION All Work, materials, and equipment are to be in accordance with the Contract Documents on file in the office of the City Clerk, and at the office of HR Green, Inc. (Engineer), 8710 Earhart Lane SW, Cedar Rapids, IA 52404, by this reference made a part hereof as though fully set out and incorporated herein. The Work for the said improvement, as required by the Contract Documents, is generally described as follows: The City of Wilton, Iowa is installing a standby packaged engine generator at the water treatment plant capable of operating the entire water treatment plant during a power outage. The City of Wilton, IA, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. CERTIFIED CHECK OR BID BOND: Five (5) Percent of Total Amount of Bid ENGINEER'S ESTIMATE: $271,300 SUBSTANTIAL COMPLETION DATE: November 14, 2025 FINAL COMPLETION DATE: December 19, 2025 All questions about the meaning or intent of the Contract Documents are to be directed to Engineer. Additions, deletions, or revisions to the Contract Documents considered necessary by the Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by the Engineer or Owner as having received the Contract Documents. Questions received less than ten (10) days prior to the date of Bids may not be answered.

Post-Bid

Water / Sewer

$271,300.00

Public - City

Renovation

10

14

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
49
Bidding Soon
488
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 25, 2024

img_map_placeholder

710 W 3rd St, Wilton, IA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.