BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in West Valley City, Utah. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

SOQ is estimated at $11.5-12.5M USD. GHID (Owner) invites interested contractors to submit Statements of Qualifications (SOQ) for the construction of the Anderson Groundwater Treatment Plant. The Anderson Water Treatment Plant (WTP) project includes the construction of a CMU 66 foot x 66 foot building with architectural features, HVAC, plumbing, drains, electrical and controls. The treatment processes include two parallel horizontal pressure filters with GreensandPlus media and onsite sodium hypochlorite generation. The WTP is sized for up to 6,000 gpm. The District has already engaged in a procurement process for the horizontal pressure filters, media and other ancillary equipment and this will be awarded by the end of May. The site work includes landscaping, grading, drainage, fencing, security and lighting for the entire Well 16/Anderson WTP Site. The yard piping includes approximately 420 feet of 8-inch to 24-inch stormdrain, 160 feet of 6-inch sewerline, and 225 feet of 24-inch raw and finished waterline. Additionally, the project includes relocating the existing generator. The project also includes two (2) 10 foot diameter by approximately 70 foot long cylindrical FRP underground water storage tanks, offset 10 feet from the north side of the building, that will slowly meter backwash wastewater into the sewer system. An 8,500 cubic foot storm drain/pump-to-waste basin is also included in the project. All sewer and water services will need to remain in-service for the duration of the project. The District has been working with the Red Oaks Village HOA, the owners of the property to the south of the Site. The neighboring sites will need to be protected as further noted in the plans and impacts minimized to the extent practicable. The District reserves the right to accept or reject any or all SOQs, with or without cause, or to accept the SOQs which, in its sole judgment, best serve the interest of the District. All decisions related to this solicitation will be final. Notice of Award Wednesday, September 18, 2024 Notice to Proceed Tuesday, October 1, 2024 Date of Substantial Completion Tuesday, September 30, 2025 Date of Final Completion Tuesday, November 4, 2025 RFQ Question and Answer period ends Tuesday, May 14, 2024 (5:00 p.m.) Contacts Zak Bedard z.bedard@ghid.org Phone +1 801-955-2242 ext. 242 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$12,500,000.00

Public - City

New Construction, Site Work

284

5

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
72
Bidding Soon
997
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 4, 2024

October 1, 2024

November 4, 2025

img_map_placeholder

To Be Determined, West Valley City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.