BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bangor, Maine. Completed plans call for the renovation of a educational facility.

Fourteenth Street School Exterior Window Wall System Replacements Project Question Deadline: 05/20/2024 at 4:30 PM ET, Questions Must Be Directed in Writing to Info@carpenterassoc.com , The Response Will Be in the Form of an Addendum, Which Will Be Emailed to All Plan Holders . A Bid Security Will Be Required Consisting of a 5 Percent (5%) Bid Bond or a Certified Check in Lieu of the Bid Bond is Required. Performance Bond and Payment Bond, Each for 100% of the Value of the Work Are Required. Maine Department of Labor Prevailing Wage Rate Requirements Apply to This Project. Scope of Work Summary: Remove and Dispose of Failing Window Wall Systems, Including Doors, on Four Building Elevations as Shown on Drawings; Replace With New Sills, Reinstall Aluminum Window System and New Doors. Work Includes Flashing, Trim, and Finishes. Scope of Work Summary: Remove and dispose of failing window wall systems, including doors, on four building elevations as shown on drawings; replace with new sills, reinstall aluminum window system and new doors. Work includes flashing, trim, finishes. SCOPE OF WORK: A. This statement shall apply to all sections of these specifications: All of the provisions of the CONTRACT AGREEMENT shall be a part of these specifications. The General Contractor and each Subcontractor shall fully inform himself of these documents before proceeding with any work. B. All fees, permits, and licenses necessary for the prosecution of the work shall be secured and paid for by the Contractor. C. The General Contractor shall be responsible for himself as well as his Subcontractors to prevent damage in all areas of finished work. Any damaged areas shall be repaired and refinished in a new condition before leaving the project. D. The work consists of all supervision, labor, equipment, and material to complete the project in strict accordance with these specifications and drawings. E. The General Contractor shall be responsible for the following temporary facilities: All necessary temporary buildings such as office, toilets, shops, and storage facilities. 1. Temporary Toilet Facilities Toilet facilities shall be provided by the Contractor. 2. Temporary Light and Power Temporary power is available for incidental electrical use (not for heating or welding) by the Contractor at no cost. 3. Temporary Water A temporary water connection for the work shall be provided by the Owner. SCOPE OF WORK This work includes, but is not limited to, the following items: A. Cutting, patching and flashing new equipment roof penetrations. B. Cutting and patching duct penetrations through existing walls. C. Cutting and patching floor and roof penetrations for electrical conduits. D. Roof walkways. Work Included: provide and install, unless otherwise indicated below, all carpentry and millwork required for a complete and finished project, to include but not be limited to, the following: A. Replace wood sill at areas indicated on plans. B. All millwork, trim, and other finish woodwork. THE WORK INCLUDES: A. Demolition B. Miscellaneous cutting and patching C. Rough Carpentry D. Door and Window Installation E. Miscellaneous Finishes F. Painting G. Associated electrical work. This is only a general description and does not purport to describe the project completely The work consists of furnishing all plant, labor, equipment, materials, and services for this project. The work consists of all supervision, labor, equipment, and material to complete the project in strict accordance with these specifications and drawings Scope of Work Summary: Remove and dispose of failing window wall systems, including doors, on four building elevations as shown on drawings; replace with new sills, reinstall aluminum window system and new doors. Work includes flashing, trim, finishes Documents may also be examined at the following locations: ONLINE at: Construction Summary of Maine - www.constructionsummary.com Construction Market Data Group - www.cmdgroup.com Dodge Data & Analytics - www.support@construction.com Via Email – info@carpenterassoc.com Subject: BID: 14 th Street Exterior Window Wall System Via Fax – (207) 827-8234 Call to arrange drop off – (207) 827-8001

Award

Educational

$715,500.00

Public - City

Renovation

6

11

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
7
Bidding Soon
164
All Active Projects
66
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

224 14th St, Bangor, ME

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.