BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 25, 2024 at 8:00 PM

Updated June 26, 2024

Site work for a water / sewer project in Auburn, Washington. Completed plans call for site work for a water / sewer project.

Cured-in-Place Pipe (CIPP) rehabilitation of approximately 5,907 linear feet of 8 inch diameter sewer main lines; installation of one-piece main and lateral cured-in-place liner meeting ASTM F2561 on seventy (70) 6-inch sewer laterals, extending three (3) feet up the lateral without the use of a cleanout; rehabilitation of 27 manholes; contingent rehabilitation of 320 linear feet of 4-inch and 240 linear feet of 6-inch lateral sewer linings and eight (8) each cleanout installation and wye open cut replacement (may not be included in work) all necessary traffic control; and restoration when construction is completed. Please contact the Owners Purchasing Manager at 253-946-5415 or procurement@lakehaven.org with any questions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is located in King County and is part of the Lakehaven Water and Sewer District (OWNER). The work includes the sewer system generally south of South 291st Street, west of 39th Avenue South, north of 36th Place South, and east of 34th Avenue South. 1.02 WORK OF THIS CONTRACT A. The work to be performed under this contract includes the following: 1. Cleaning and Cured-in-Place Pipe (CIPP) rehabilitation of approximately 5,907 linear feet of 8-inch diameter mainline pipe. 2. Installation of one-piece main and lateral cured-in-place liner meeting ASTM F2561 on 70 6-inch sewer laterals, extending three (3) feet up the lateral without the use of a cleanout. 3. Rehabilitate 27 manholes. 4. Restoration of property when construction is completed. 5. Traffic control in the project area. 6. Contingent lining of up to eight (8) side sewers, complete from immediately adjacent to the house to the connection with the main, including cleanout installation, 4-inch upper side sewer, replacement of existing concrete wyes with PVC fittings, and 6-inch lower side sewer.

Award

Water / Sewer

$1,392,615.00

Public - State/Provincial

Site Work

10

18

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
82
Bidding Soon
1,121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

July 22, 2024

Project location map

Multiple Locations, Auburn, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.