BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and paving for a mixed-use development in Arvin, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Full depth recycle and V-ditches. 06-Ker-223-1.8/10.4 In Kern County Near Bakersfield From Route 223/5 Separation To 0.1 Mile West Of Route 223/99 Separation The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12. 110 Working Days * 21% DBE Requirement Submit your bid with bidder's security equal to at least 10 percent of the bid CADOT - Full Depth Recycle and V-Ditches

Bid Results

Roads / Highways

$9,328,350.00

Public - State/Provincial

Paving, Site Work

3

10

5

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
77
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

December 29, 2025

Project location map

CA-223, Arvin, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.