Site work for a mixed-use development in Arvin, California. Completed plans call for site work for a educational facility; and water / sewer project.
Arvin High School: 5-Year Portables Electrical 1. These portables will be a phased construction schedule. B14-20 will be first. Then B8-13, then B1-B7. The sequencing and timing of the project will determine how B21 to B35 are completed. Refer to the construction schedule for timelines that must be met by each prime contractor or be subject to liquidated damages. The contractor shall account for any overtime or crew size increases to maintain the schedule. Contractor shall also assume they may be required to work on more than one phase at a time. 2. The District will have all portables on temporary power, communications, and fire alarm prior to the project starting. This contract shall still remove all existing data cabling in the portables and turnover to the District all audio visual, IDF and fire alarm components. 3. Coordinate with the district and its communications, fire alarm, and power teams for shutdown and start-up of each system. Contractor shall account for, in their scheduling, to accommodate the district to perform their scopes of work within the summertime schedule. This also includes the removal of desks, installation of desks, and removal and installation of the portables. All scopes of work for occupancy must be complete during the summer schedule. 4. Contractor shall hire a ground penetrating radar company as well as other means necessary to survey all trench locations to ensure all utilities are found and location and depth are verified. This shall occur prior to any work so that revised routing can be coordinated. The contractor shall provide all conflicts to the design team prior to work commencing so a complete and coordinated design is achieved. The contractor needs to ensure all existing and new underground work does not conflict with new utilities. The is an existing high voltage solar conduit and cabling. Contractor shall identify it and its depth and layout all crossings to ensure its protection.5. New trenching, conduit, boxes, backfill, grounding system and wiring as per the contract documents. Contractor will encounter existing underground utilities from previous portables. Contractor to assume to be working on conduits behind portables as concrete contractor is working on rebar and formwork for foundations to help expedite the schedule. 6. Provide and install fire alarm complete per the contract documents. Prior to procurement of any materials, setup a coordination with District and its Fire Alarm system supervisor for a pre-construction meeting. 7. Provide and install data/communications complete per the contract documents including wiring within the portable, IDF, and terminations. All wiring shall be within walls or ceilings. Prior to procurement of any materials, setup a coordination with District and its Data/Communications system supervisor for a pre-construction meeting. 8. Contractor furnished, and contractor installed projector mount. Pursuant to Public Contract Code section 20111.6, prequalification of the prime contractor (bidder), and of its mechanical, electrical, and plumbing ("MEP") subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46), is required for the bidder to submit a bid on this project. Prospective bidders and their MEP subcontractors (1) are required to submit to the Owner a completed prequalification questionnaire and financial statement, on forms provided by the Owner, no later than ten business days prior to the date fixed for the public opening of sealed bids, and (2) must be announced as prequalified no later than five business days prior to the date fixed for the public opening of sealed bids. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Start/Delivery Date January 6, 2025 Project Duration 180 Calendar Days Liquidated Damages $3,500.00 per calendar day License Requirements C10
Sub-Bidding
Educational
$600,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 4, 2024
January 6, 2025
900 Varsity Rd, Arvin, CA
Related To This Project
Arvin, CA
Bid Date: Dec 04 2024
Arvin, CA
Bid Date: Nov 06 2024
Arvin, CA
Bid Date: Oct 16 2024
Arvin, CA
--
Arvin, CA
Bid Date: May 29 2024
Arvin, CA
--
Arvin, CA
--
Arvin, CA
Bid Date: Apr 30 2024
Arvin, CA
Bid Date: May 08 2024
Arvin, CA
Bid Date: Apr 11 2024
Arvin, CA
Bid Date: Mar 12 2024
Arvin, CA
Bid Date: Feb 28 2024
Arvin, CA
Bid Date: Mar 20 2024
Arvin, CA
Bid Date: Feb 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.