Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 12, 2024 at 7:00 PM
Updated December 13, 2024
Demolition, site work and new construction of a mixed-use development in Arvin, California. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.
Arvin High School: 5-Year Portables Demolition These portables will be a phased construction schedule. B14-20 will be first. Then B8-13, then B1-B7. The sequencing and timing of the project will determine how B21 to B35 are completed. Refer to construction schedule for timelines that must be met by each prime contractor or be subject to liquidated damages. Contractor shall account for any overtime or crew size increases to maintain the schedule. Contractor shall also assume they may be required to work on more than one phase at a time. 2. Provide rough grading for Portable B1-B13 and B21-27. Coordinate with concrete contractor for correct subgrade elevations and step locations. 3. Demolition of existing fencing not shown to be re-used. 4. Contractor will encounter existing underground utilities from previous portables. All existing conduits, boxes and irrigation mainline/control wire shall be removed as encountered during construction operations. 5. Contractor shall removal offsite all spoils not required for this project. For spoils required to backfill against foundations upon completion, coordinate the proper amount with the concrete contractor. The concrete contractor shall be responsible for backfill against new concrete foundations. 6. Coordinate with the District for the sequencing and schedule for disconnect and removal of existing portables. 7. There is an existing high voltage solar conduit and feeder running under these portables. Contractor shall pothole and hydro excavate the line at all important locations to ensure its protection. 8. There is an existing electrical feed from the electrical yard just south of new portable B2 that runs to the softball field scoreboard and an electrical box north of new portable B19. Coordinate with the district for its protection during construction. 9. Provide and install new storm drain system and drain structures per the design documents. 10. Provide and install new condensate and drywells as required for the portables. 11. Provide and install underground plumbing (water and drainage) for owner furnished contractor installed drinking fountain. 12. Disconnect and removal of water and waste from existing restroom. Reinstallation of water and waste to new restroom location utilizing waste and water from previous location Pursuant to Public Contract Code section 20111.6, prequalification of the prime contractor (bidder), and of its mechanical, electrical, and plumbing ("MEP") subcontractors (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46), is required for the bidder to submit a bid on this project. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Project Duration 180 Calendar Days Start/Delivery Date January 6, 2025 Liquidated Damages $3,500.00 per calendar day License Requirements C12, C36
Bid Results
Educational
$189,300.00
Public - County
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2024
January 6, 2025
900 Varsity Rd, Arvin, CA
Related To This Project
Arvin, CA
Bid Date: Jan 08 2025
Arvin, CA
Bid Date: Jan 06 2025
Arvin, CA
Bid Date: Feb 04 2025
Arvin, CA
Bid Date: Mar 27 2025
Arvin, CA
Bid Date: May 07 2025
Arvin, CA
Bid Date: May 21 2025
Arvin, CA
Bid Date: Dec 11 2024
Arvin, CA
Bid Date: Dec 11 2024
Arvin, CA
Bid Date: Jan 08 2025
Arvin, CA
Bid Date: Nov 06 2024
Arvin, CA
Bid Date: Oct 16 2024
Arvin, CA
--
Arvin, CA
Bid Date: May 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
