Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 20, 2025 at 7:00 PM

Updated March 31, 2026

Site work and paving for a mixed-use development in Arvin, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Full depth recycle and V-ditches. 06-Ker-223-1.8/10.4 In Kern County Near Bakersfield From Route 223/5 Separation To 0.1 Mile West Of Route 223/99 Separation The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12. 110 Working Days * 21% DBE Requirement Submit your bid with bidder's security equal to at least 10 percent of the bid CADOT - Full Depth Recycle and V-Ditches

Award

Roads / Highways

$9,328,350.00

Public - State/Provincial

Paving, Site Work

3

10

5

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
70
Bidding Soon
1,260
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

December 29, 2025

Project location map

CA-223, Arvin, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed