Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2024 at 8:00 PM
Updated June 14, 2024
Renovation of an educational facility in Stratford, Prince Edward Island. Completed plans call for the renovation of a educational facility.
Stratford High School - Trade Package #7 - Electrical .1The work included in this contract shall include the furnishing of labour, materials, equipment, plant, tools, and services, necessary for or incidental to the supply, installation, and completion of the Mechanical Systems to the full intent of the drawings and as hereinafter specified. .2 Any work or equipment herein specified but not shown on the plans, or vice versa, or any work, material or equipment necessary for the proper completion of the job, shall be furnished and installed as though both shown on the plans and specifications. .3 The work shall generally include, but not be limited to the following: .1 Provision of plumbing systems as indicated or specified herein. .2 Provision of heating systems as indicated or specified herein. .3 Provision of ventilation systems as indicated or specified herein. .4 Provision of automatic controls systems as indicated or specified herein. .5 Provision of insulation for mechanical systems as indicated or specified herein. .6 Provision of fire protection systems as indicated or specified herein. Tender documents are available electronically at: http://www.princeedwardisland.ca/en/tenders Contact: Ian Harper: Tel 902-569-4000; Fax 902-569-1149; Email: iharper@apmmaclean.ca * The project value listed reflects the total project estimate. Question Deadline 05/20/2024 All addenda will be posted online at www.princeedwardisland.ca/tenders, Bidders are responsible to check the website regularly, for addenda until the Bid submission time. .5 All enquires or requests for clarification from Bidders are to be made in writing and submitted to the Construction Manager not less than three (3) business days before the date set for receipt of Bids. Reply will be in form of an addendum, no later than two (2) working days before the date set for receipt of Bids. Direct questions to the Construction Manager, identified in Section 00 01 01. 535-18056
Bid Results
Educational
$10,696,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2024
July 8, 2024
Bunbury Rd & Mason Rd, Stratford, PE
Related To This Project
Stratford, PE
Bid Date: Jun 06 2024
Stratford, PE
Bid Date: Jun 11 2024
Stratford, PE
Bid Date: May 24 2024
Stratford, PE
Bid Date: Jun 18 2024
Stratford, PE
Bid Date: Jun 27 2024
Stratford, PE
Bid Date: Jul 09 2024
Stratford, PE
--
Stratford, PE
Bid Date: May 15 2024
Stratford, PE
Bid Date: Apr 30 2024
Stratford, PE
Bid Date: Apr 04 2024
Stratford, PE
Bid Date: Apr 04 2024
Stratford, PE
Bid Date: Mar 20 2024
Stratford, PE
Bid Date: Feb 29 2024
Stratford, PE
Bid Date: Feb 14 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
