BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Salem, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Sealed Bids should be labeled "ROADWAY IMPROVEMENTS W. KELL ST AND N COLLEGE AVE - PROPOSAL NO. P2024- 08 on the outside of the bid submittal envelope. The proposed work consists of the roadway improvements to Kell St. and N. College Ave. Improvements include surface milling, HMA resurfacing, pavement patching, PCC pavement and other miscellaneous work to complete the project. No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any other workmen employed in the construction of this project. All proposals must be accompanied by a proposal guarantee. No Bidder may withdraw its bid for a period of thirty (30) days after the actual date of the opening. The City of Salem, Illinois, reserves the right to reject any or all bids and to waive any informalities or technicalities in the bidding All questions about the meaning or intent of the Contract Documents shall be submitted to the ENGINEER in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by the ENGINEER as having received the Contract Documents. Questions received less than three (3) days prior to the date for opening of Bids will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. SCOPE OF WORK: The Contractor shall perform everything required to be performed, and shall provide and furnish at his sole cost and expense all the labor, tools, materials (except as otherwise specified), expendable equipment, transportation services, bonds, and insurance required for ROADWAY IMPROVEMENTS - W. KELL ST. AND N. COLLEGE AVE. - PROPOSAL NO. P2024-08 all in strict accordance with the Contract Documents, including any and all addenda, prepared by the City of Salem, in these Contract Documents referred to, as Owner, which Plans and Specifications, and other Contract Documents, are hereby made a part of this Contract; and the Contractor shall do everything required by this Contract and the other Documents constituting a part hereof.

Award

Roads / Highways

$371,300.00

Public - City

Paving, Site Work

12

9

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
32
Bidding Soon
476
All Active Projects
193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2024

July 15, 2024

img_map_placeholder

W Kell Rd & S College Ave, Salem, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.