Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2024 at 8:00 PM

Updated June 27, 2024

Renovation of a municipal facility in Vincent, Alabama. Completed plans call for the renovation of a municipal facility.

Please contact the Project Manager, Brad Davis at bwdavis@shelbyal.com with any questions regarding this project. SCOPE OF WORK A. Contractor shall utilize construction practices to minimize erosion and sediment runoff during construction. Installation of all required BMPs shall be the responsibility of the Contractor as outlined in the project notes. B. Work of this section includes the installation of devices to collect or trap silt from leaving the site as required and shall be performed by the Contractor if required. C. Work shall comply with the latest edition of city ordinance and/or regulations and requirements of any governing authorities in clearing and erosion control. D. The intent of these specifications is to ensure that erosion produced by this project is minimized to the maximum extent possible. E. All areas that are part of the trail construction shall be stabilized as soon as possible using the most appropriate BMPs. 1.2 REFERENCES Alabama Department of Transportation Standard Specifications for Highway Construction Section 650 Topsoil, Section 651 Ground Preparation and Fertilizing for Erosion Control, Section 652 Seeding, Section 656 Mulching.

Award

Municipal

$349,380.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
48
Bidding Soon
1,160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2024

June 20, 2024

Project location map

8431 Highway 62, Vincent, Vincent, AL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed