BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, outdoor lighting, new construction, remodeling and renovation of a mixed-use development in Purvis, Mississippi. Conceptual plans call for the remodel of a educational facility; for the renovation of a office development; for the construction of a educational facility; for the demolition of a educational facility; for site work for a water / sewer project; playground / park / athletic field; and for outdoor lighting for a educational facility.

The Lamar County School District will hold a new bond referendum on Tuesday, November 5, 2024, aimed to construct new schools within the district. If approved the district plans to start construction of the new schools in July 2025. If approved, Included in this bond: Lumberton- A new Physical Education facility Oak Grove- A new Oak Grove MS: 2 story structure built on Hwy 98 West on 16th section land that the school district already owns. 6th, 7th, and 8th grades with a capacity of 1,400 students. (OGMS currently has 1,250 students) The building will have a Competition Gymnasium and Band Hall. The current OGMS: The building on Old Hwy 24 will be renovated for the 11 Oak Grove Pre- Kindergarten classes. The back of the campus (Old Hwy 11 entrance) will be converted into Career and Technical Education Classes. A new Oak Grove Elementary Office Building: The current office space will be converted back to classrooms. Purvix/Baxterville- A new Purvis HS: 2 story structure built on Hwy 11 on 16th section land that the school district already owns. 9th, 10th, 11th, and 12th grades with a capacity of 900 students. (PHS currently has 610 students) The building will have a Competition Gymnasium, Band Hall, Choral, Practice/P.E. Fields, and JROTC. Sumrall- A new Sumrall HS: 2 story structure built on Hwy 44 on 16th section land that the school district already owns. 9th, 10th, 11th, and 12th grades with a capacity of 900 students. (SHS currently has 630 students) The building will have a Competition Gymnasium, Band Hall, Choral, Practice/P.E. Fields, and JROTC. Finally, the district would install necessary water, light, heating, air conditioning and sewerage facilities at all campuses.

Conceptual

Educational

$117,000,000.00

Public - County

Demolition, New Construction, Outdoor Lighting, Remodeling, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
32
Bidding Soon
390
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

img_map_placeholder

424 Martin Luther King Dr, Purvis, MS

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.