BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Helena, Montana. Completed plans call for site work for a road / highway; and water / sewer project.

The State of Montana Natural Resource Damage Program, is issuing an Invitation for Bid (IFB) for construction services. A more complete description of the services are provided in the Invitation to Bid and other Bidding Documents. Bids submitted in response to this IFB must comply with the instructions and procedures presented in the Bid Documents. For assistance with eMACS functionality, such as vendor registration, responding to events, contact the eMACS Help Desk, 406-444-2575, emacs@mt.gov. PROJECT LOCATION The Project is located within the Spotted Dog Wildlife Management Area in Powell County, approximately 9 miles south of Avon, Montana. The project can be accessed from Avon via Spotted Dog Creek Road to the WMA entrance and then via an unnamed road to Jake Creek Road or US Forest Service Road 314. The WMA is closed annually between December 2 and May 14. PROJECT DESCRIPTION The Work will generally consist of providing all labor, materials, earthwork, and incidentals necessary to complete the Work required by the Contract Documents including as shown on the Drawings and described in the Special Provisions and Technical Specifications. Work generally includes: restoration of a small diverted tributary stream; stabilization an active headcut, construction of main channel plugs; floodplain entrance channels, and low profile channel plugs at three sites; construction of beaver habitat structures; reinforcement of a previously constructed main channel plug, construction of gravelsod check dams, repairs and enhancements on previously completed restoration work, removing a damaged culvert and associated fill material, and construction of large wood structures. the project site is located on montana fish, wildlife and parks land approximately 8 miles upstream from the confluence with the little blackfoot river near avon, mt. the work described in this plan set represents phase 4 of work completed by the state to improve wetland and riparian resources within the spotted dog wma. phase 1 was completed in 2020 and included construction of beaver habitat structures and slope wetland restoration. phase 2 was completed in 2021 and included channel and floodplain restoration. phase 3 was completed in 2022 and included reinforcing an existing beaver dam and construction of beaver habitat structures. proposed work is being done to create conditions for increased beaver occupancy in upper spotted dog creek and south fork spotted dog creek to restore floodplain connectivity, enhance riparian ecological function and increase wetland area. PROJECT TIME The Contract Times for the Work will be 106 consecutive calendar days from the date indicated in the Notice to Proceed. Work must not commence until July 15, 2024, for in-channel work and must be completed prior to October 15, 2024. Question Deadline 05/21/2024 at 5:00 PM MT All questions about the meaning or intent of the Contract Documents must be submitted in writing through eMACS. Responses to bidder questions will be posted to the Q & A Board on or about May 23, 2024. Only answers posted by Owner to eMACS will be binding. Bidders are responsible for checking eMACS for updates and any Addenda prior to submitting a Bid.

Bid Results

Roads / Highways

$96,345.00

Public - State/Provincial

Site Work

44

11

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
81
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2024

July 15, 2024

img_map_placeholder

Multiple Locations, Helena, MT

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.