Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in N Richmond, California. Contact the soliciting agency for additional information.
West County Wastewater District ("WCW") is seeking proposals from qualified firms to provide Prepare the Landscape Construction Plans for the Foster Lane Sewer Realignment Project. The Engineer shall also prepare the Front and Back-end specifications for the provided Sewer Realignment Engineering plan and subsequently Combine Landscape & Engineering plans and prepare all necessary bid documents for construction. ("Services"), as further detailed in Section 3, Scope of Services. If approved by WCW's Board of Directors, the successful Proposer will execute an agreement in the form of Attachment A for one (1) year base term with up to four (4) one year option terms. . The project scope, content of proposal, and selection process are summarized in this Request for Proposals ("RFP"). WCW intends to adhere to the solicitation schedule shown in the Timeline below, which is subject to change at WCW's sole discretion. Questions and Requests for Clarifications ("RFCs") Due:May 14, 2024, 4:00pm WCW's Response to Questions/RFCs:May 21, 2024, 4:30pm Questions regarding this RFP are to be submitted and answered through WCW's at online. Submission of a proposal constitutes a firm offer to WCW for 180 days from the deadline. Background WCW provides wastewater collection and treatment services to approximately 100,000 residents. WCW is a political subdivision of the State of California and operates as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole, and some unincorporated areas within western Contra Costa County. WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with a National Pollutant Discharge Elimination System (NPDES) permitted capacity of 12.5 million gallons per day. Approximately 50 years ago, a landslide compromised the gravity sewer on Foster Lane. Initially, a lift station was constructed to provide sewer service to the residents, while the acquisition of easements and the preparation of the Engineering plan could be completed. The Engineering plans for the project (to restore the gravity sewer infrastructure and decommission the lift station) were completed in 2022, but complete project technical specifications still need to be prepared for the construction bid documents. All other easements and agreements were finalized in the first half of 2023. In compliance with the easement agreements, certain work must be performed during and post construction to restore the parcels to their prior condition. This work includes landscaping and other outdoor hardscape-related tasks. For WCW to request construction bids in Opengov, the on-call consultant will need to provide the following: Supply the Landscape Construction plans with a technical specifications addendum for the Foster Lane Sewer Realignment Project. Provide the technical specifications for the Engineering plan (provided by WCW) based on WCW's template for public works specifications. Prepare the Front and Back end specifications (based on WCW's template for public works specifications), for the Sewer Realignment Engineering plan (also furnished by WCW). Combine Landscape and Engineering plans and prepare all necessary bid documents for constructing the Foster Lane Sewer Realignment Project.. Landscape Scope of Work This project includes the preparation of the Landscape Construction Plans for the Foster Lane Sewer Realignment Project by the consultant and performing various works during and after the project's construction. The plans will be used to remediate the landscaping of all six parcels affected by the project. The design must incorporate the terms specified in easement acquisition documents. SCOPE: The Consultant's responsibilities will include, but are not limited to, producing final plans, cost estimates, and specifications. The consultant must utilize the easement agreements and available conceptual renderings provided. The following will be accomplished under this contract: Conduct a site survey to identify the actual conditions of the site before preparing design drawings. Prepare the Landscape Construction Plan to match the provided renderings and site conditions. Select appropriate plant material for the Landscape Construction Plan - trees, shrubs, grass, ground cover, etc. Prepare Hardscape drawings (as part of the Landscape Construction Plan set) - deck, stairs, fence, paving, affected hardscapes, etc. Design Deliverables must be submitted within 25 working days from the T.O. Proposal issuance date. Provide Inspection of the Landscape Scope of Work during construction. Provide post-construction services, including site inspections and the preparation of as-built drawings upon completion of the construction work. Stamp all civil engineering drawings (if applicable) by a California registered professional engineer (P.E.) Refer to the attachment section (Attachments F, H & I) for further details.
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2024
Multiple Locations, N Richmond, CA
Related To This Project
N Richmond, CA
Bid Date: May 29 2024
N Richmond, CA
--
N Richmond, CA
--
N Richmond, CA
Bid Date: Aug 07 2024
N Richmond, CA
Bid Date: Jun 13 2024
N Richmond, CA
Bid Date: Jul 11 2024
N Richmond, CA
Bid Date: Jun 28 2024
N Richmond, CA
--
N Richmond, CA
Bid Date: May 16 2024
N Richmond, CA
Bid Date: Jun 04 2024
N Richmond, CA
Bid Date: Apr 22 2024
N Richmond, CA
Bid Date: Apr 30 2024
N Richmond, CA
Bid Date: Apr 17 2024
N Richmond, CA
Bid Date: Mar 28 2024
N Richmond, CA
Bid Date: Jun 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.