BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated March 25, 2025

Renovation of an educational facility in Portland, Oregon. Completed plans call for the renovation of a educational facility.

https://djcoregon.com/news/2025/02/03/9-3-million-tenant-improvement-in-portland-building-permits-feb-3-2025/ A $2,210,000 alteration permit was issued for 2921 S.E. 116th Ave. Interior and exterior updates will include installation of siding, application of finishes, installation of a walk-in cooler and a walk-in freezer, construction of a new restroom and a new secure vestibule, and replacement of backflow assembly. Nathan Arnold of Faster Permits is the applicant, David Douglas School District is the project owner, and Steve Paschal (Balfour Beatty Construction) is the contractor. Interior and exterior updates would include siding, finishes, a walk-in cooler, a new walk-in freezer, a new restroom, and a new secure vestibule. Also, backflow assembly would be replaced. _______________ The project consists of a voluntary set of upgrades to the existing Elementary School as part of the November 2022 Bond Measure. The specific improvements on this site include: o Upgraded HVAC System o Remodel of existing areas to include spaces for specialists o Remodel of the entry for a secure vestibule o Replacement of the Fire Alarm System o Improvements to the Electrical Service Entrance with more capacity This is a proposal request for Electrical Systems only. The field work for this project will be completed June-August, 2025. -------------------------------------------- As of March 2025, Permit has been issued on March 6th ,2025 for this project. A Construction Manager has been assigned. A firm timeline has not been disclosed yet. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Post-Bid

Educational

$295,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
45
Bidding Soon
1,004
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

April 28, 2025

Project location map

2921 SE 116th Ave, Portland, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.