BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2024 at 8:00 PM

Updated February 15, 2025

Site work for a transportation facility in Portland, Oregon. Completed plans call for site work for a transportation facility.

Question Deadline 06/04/2024 at 5:00 PM PT Questions must be submitted electronically. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract The work includes but is not limited to Removing and disposing of existing passenger boarding bridges (PBBs) at Gates C4, D4, C23, and D15; providing new PBBs and associated equipment to replace the removed PBBs; removing and reinstalling various elements of PBB equipment at these gates; and furnishing new PBBs and associated equipment for Gates B1, C3, D3, and E1 for installation by others under a separate contract. The work includes installation and commissioning of PBBs, ground power units, preconditioned air units, equipment monitoring system, conductors, breakers, and disconnects. The work also includes removing and disposing of four PBBs stored at a separate location on airport property. Also included is an additive alternate for providing one PBB at Gate C18. The alternate may be awarded solely at the option of the Port. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $12,500,000 Online Q&A Yes Q&A Deadline 06/04/2024 5:00 PM (PDT) Scope of Services Removing and disposing of existing passenger boarding bridges (PBBs) at Gates C4, D4, C23, and D15; providing new PBBs and associated equipment to replace the removed PBBs; removing and reinstalling various elements of PBB equipment at these gates; and furnishing new PBBs and associated equipment for Gates B1, C3, D3, and E1 for installation by others under a separate contract. The work includes installation and commissioning of PBBs, ground power units, pre-conditioned air units, equipment monitoring system, conductors, breakers, and disconnects. The work also includes removing and disposing of four PBBs stored at a separate location on airport property. Also included is an additive alternate for providing one PBB at Gate C18. The alternate may be awarded solely at the option of the Port.

Bid Results

Transportation Terminals

$11,248,426.00

Public - City

Site Work

77

29

29

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
64
Bidding Soon
973
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.