BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Garland, Texas. Completed plans call for the renovation of a power facility.

As of July 15, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Question Deadline 05/27/2024 at 5:00 PM CT All questions must be answered within the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to, This is an evaluated bid, please pay close attention the information requested on the Construction Contractors Questionnaire and provide a complete and organized response. Award must be made to the vendor submitting the most advantageous offer considering the relative importance of price and other evaluation factors. City reserves the right to request a best and final offer upon completion of negotiations. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response. A Bid Bond in the amount of 5% is required with your bid response. Failure to provide a Bid Bond could deem your bid non-responsive. A Performance, Payment and Maintenance (2 yr.) Bond will be required upon award. Please acknowledge the City of Garland's Terms and Conditions in the "Attributes" Section. All questions must be answered within the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to. The deadline for submitting questions on this bid is May 27, 2024 at 5:00 p.m. DESCRIPTION OF PROJECT The Holford Road Switching Station project is located in Garland, Texas. The project is the development of a new, green field site in conjunction with the development of an adjacent data center campus by others. The GP&L 138 kV Switch Yard constructed by this Contract will send load over the fence to serve the new data center campus. Transmission Line construction will also be ongoing by others to provide a power source for this new switchyard location. SCOPE OF WORK FOR THIS CONTRACT Major scope items for this Contract are listed as follows. Efforts have been made to achieve a reasonable level of completeness however the following list should not be considered exhaustive. All attached and referenced design documents are incorporated and made part of the bid documents. 1. It is assumed that the site developer will terminate their SWPPP permit for the larger developed campus area. This will occur on or around the time of transfer of ownership for the smaller site pad used by this Project to GP&L. The intent is to initiate a new SWPPP permit to cover the period of construction. GP&L must be listed as the ultimate owner but the successful bidder on this Contract will be the named entity on the new SWPPP permit. The site will be graded with BMP's already in place according to the previous SWPPP permit held by the site developer. It will be the responsibility of this Contract to perform reporting and monitoring duties as well as to make any repairs required along the way. 2. Install Foundations for all structures as indicated. This Contract to provide rebar and concrete with all drilling, forming, removal of spoils, etc. required for a complete foundation installation. The Owner is providing anchor bolts and steel. The geotechnical report is included for reference. Note the site is rocky with a soft limestone rock and effectively no topsoil cover. 3. The site will be provided graded and with 8" of flex base material already installed. This is intended to provide a workable and weather resistant surface to support the construction efforts of this Contract. 4. The site will be provided with high security fence already in place. This will provide a secure construction site and limited laydown area. Should additional area beyond the high security fence be needed for laydown, storage, parking, construction offices, etc. this will be the responsibility of this Contract. Note that the high security fence will be provided initially with the motorized gate unpowered. It will be manually operable along with the other 2 access gates. The motorized gate will be powered and commissioned near the end of the project.

Bid Results

Power Plant

$2,400,482.00

Public - City

Renovation

245

15

4

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
67
Bidding Soon
3,565
All Active Projects
1,412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2024

July 1, 2024

img_map_placeholder

To Be Determined, Garland, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.