BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2024 at 8:00 PM

Updated August 15, 2025

Site work and new construction of a military facility in Quinte West, Ontario. Completed plans call for the construction of a 270,000-square-foot, one-story above grade military facility; and for site work for a military facility.

DEFENCE CONSTRUCTION CANADA (DCC) is requesting Proposals from Design-Build Teams to design and construct the STTC Main Operating Base - East at 8 Wing Trenton, Ontario following a modified design-build approach. Additional details are provided in the Request for Proposals (RFP) documents. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA), Chapter Nineteen of the Canada-European Union Comprehensive Economic and Trade Agreement (CETA) and the World Trade Organization Agreement on Government Procurement (WTO-AGP). Work Package 1: Design of concrete apron expansion for five (5) drive in/drive out apron aircraft parking spaces, asphalt taxilane, flight line parking, apron/taxiway edge lighting and apron flood lighting. Apron expansion and taxilane construction will eliminate the existing storm water retention pond located to the east of the current North Apron footprint. Design will include for a new facility properly sized to account for loss of existing pond and increased hard surface as a result of the project. Work Package 2: Design of a new approximately 25,000 net m2 437 Transport Squadron (437 (T) Sqn), North American Aerospace Defence (NORAD) Readiness Posture (RP), and In-Service Support (ISS) Maintenance Contractor Facility. The facility will include two (2) hangar bays to house one (1) aircraft in each bay, office spaces, maintenance workshops, telecommunications rooms, common spaces, storage, exterior parking for privately owned motor vehicles, short term tractor trailer parking and separate tractor trailer parking. The facility will require re-routing of an existing roadway which will be included in the design. Additionally, the design will include all required security fencing as per the Security Design Brief (SDB) and extension of site services. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform The estimated contract period will be 63 month(s).

Award

Military

$21,870,755.00

Public - Federal

New Construction, Site Work

3

38

9

5

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
86
Bidding Soon
1,378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

July 17, 2024

Project location map

6 Northstar Dr, Quinte West, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.