BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Livermore, California. Contact the soliciting agency for additional information.

Direct any questions regarding this RFP to James Carney, jcarney@zone7water.com, by May 17, 2024, at 3:00PM Pacific. An addendum will be issued, if needed, within one week. The addendum will be posted to the Zone 7 website. Zone 7 is the wholesale treated drinking water supplier to retailers serving over 270,000 people in Pleasanton, Livermore, Dublin and, through special agreement with the Dublin San Ramon Services District, to the Dougherty Valley area of San Ramon. Zone 7 also supplies untreated water for irrigation of about 5,000 acres of agriculture property, primarily South Livermore Valley vineyards. Zone 7 also provides regional flood protection within the service area and administers oversight of the local groundwater basin--the Livermore Valley Groundwater Basin. Of the approximately 55,000 acre-feet of water used in Zone 7's service area (on average in a normal rainfall year) Zone 7 estimates that approximately 53% of water use is residential, approximately 11% is commercial/industrial, approximately 14% is agricultural, approximately 18% is landscape/other and approximately 4% is public water use. The 55,000 acre-feet of water referred to above includes treated water provided to retailers by Zone 7, local groundwater pumped by the water retailers, untreated agricultural irrigation water provided by the State Water Project, and local surface water. Zone 7 owns and operates groundwater production wells within four wellfields in the basin. The Chain of Lakes wellfield, as shown in Exhibit D, currently contains three active wells (COL1, COL2, and COL5). Zone 7 has secured a PG&E NEM2A IA for these three wells, to be served by the solar facility, with point of interconnection at COL5. Exhibit B provides relevant information from the PG&E IA and application. The successful Respondent shall finance, design, install, own, operate and maintain a floating solar energy system (hereinafter referred to as the "solar facility") at Zone 7's Lake I reservoir. The successful Respondent will also be responsible for the delivery of electricity to the Agency under a long-term Solar Power Purchase Agreement (PPA).

Post-Bid

Solar Power Generation

Public - County

Service, Maintenance and Supply

4

5

4

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
95
Bidding Soon
2,005
All Active Projects
822
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

July 23, 2024

img_map_placeholder

100 N Canyons Pkwy, Livermore, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.