Published July 30, 2024 at 8:00 PM

Updated July 31, 2024

Demolition, site work and addition to a water / sewer project in Hutto, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Work of this Project generally includes expansion of the Hutto South WWTP. More specifically, the Work includes, but is not limited to, construction of the following: Facility 5, Site Civil Improvements: Facility 10, Headworks Improvements: Cast-in-place headworks structure with coarse (6mm) screening, bypass and grit removal Electrical room for headworks equipment Screening and grit collection and storage Facility 15, Odor Control Improvements: Installation of a bioscrubber, ventilation fans and exhaust system for the influent lift station, headworks, and primary clarifier facilities. Facility 16, 17 and 18, Primary Clarifier Improvements: Installation of a primary splitter box and two (2) primary clarifiers with spiral rake sludge collection system, scum pumping and primary solids pumping station. Facility 19, 20 and 30, Process Train Improvements: Installation of two (2) common wall biological process basins with anaerobic, anoxic and aerobic (A2O) treatment zones. Integral mixed liquor splitter box to distribute flow to the downstream clarification process. Installation of an independent process basin splitter box structure. Facility 25, Aeration Blower Improvements: Installation of a new blower building with process air blowers and electrical & HVAC equipment. Facility 35 and 40, Secondary Clarifier Improvements: Installation of two secondary clarifiers with spiral rake sludge collection system. Installation of a RAS/WAS pump station and piping. Facility 45, Chemical Feed Improvements: Installation of Alum and sodium hypochlorite feed and storage equipment. Facility 50, 55, and 70, Tertiary Treatment Improvements: Installation of cloth media filters, UV equipment, non-potable water pump station, post aeration and effluent monitoring facilities. These facilities will be installed in common wall basins with an attached electrical building to house electrical equipment for these systems. Facility 60, 62, 64, and 65, Biosolids Improvements: Installation of a new biosolids building with two (2) new centrifuges, solids storage, polymer feed facilities and electrical gear for the equipment. Installation of a new centrifuge pump station with progressive cavity pumps to transfer biosolids from the AHSB to the biosolids building. Conversion of the existing sequencing batch reactor system to allow the basins to be used as aerated sludge holding basins. Rehab of the existing aerated sludge holding tank and belt filter press facilities to improve the performance of the existing gravity thickener and belt filter press. Electrical and SCADA Improvements: Install electrical improvements as required to power the facility. Install backup power generators. Install new transformers and site service. Install new electrical buildings to house power equipment. Install SCADA Improvements. The Question Deadline has been extended to 6/11/24 at 4:00 PM in

Post-Bid

Water / Sewer

$600,000.00

Public - City

Addition, Demolition, Site Work

61

42

274

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
37
Bidding Soon
3,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.