BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Saint Paul, Minnesota. Conceptual plans call for the renovation of a stadium; and clubhouse / community center.

The 21st Century Parks initiative has helped transform Aldrich Arena from an Ice Arena to what is now a multi-purpose Community Event Center serving 120,000 users annually (half of participants are from non-ice use) who are engaged in Quinceanera celebrations, Latinx concerts, graduation ceremonies, Hmong New Year celebrations, and beyond. In order to accommodate the significant diversity of use, future growth, and advance racial equity, funding is needed to address major issues including health and safety, ADA compliance, security, energy efficiency, amenities and beyond. Major items include: 1) Replace ceiling paint - user and staff safety issues as people can be hit by large strips of peeling / falling paint. Tests are underway to determine if asbestos remediation is required. 2) Install additional lighting and security cameras - as theft from vehicles and vandalism is an ongoing issue. 3)Replace loading dock and create an updated ADA accessible entrance which is currently non-compliant - the loading dock is failing presenting building safety issues and threatening the ability for multi-purpose use of the facility along with the need for an updated ADA accessible entrance. 4)Convert the current refrigerant R22 - which has become obsolete, to an ammonia-based ice plant. 5)Installation of a dehumidification system - needed to alleviate the occurrence of future ceiling paint issues and preserve building infrastructure. 6)Install a Building Management System - increase energy efficiency by controlling refrigeration, heat and lighting throughout the building. 7)Locker room remodeling and expansion - to address space requirements and meet modern demands. Community engagement was conducted in the summer of 2022 engaging both users and non-users. Participants helped inform facility priorities that are listed in this request. This work ties with the following County strategic priorities (1) Residents First This project will address safety issues, meet the needs of residents, increase opportunities for more equitable programming, and increase accessibility and inclusivity by addressing ADA issues. (2) Responding to Climate Change The installation of an updated refrigeration system, LED lighting, Building Automation System will reduce energy consumption. (3) Intergenerational Prosperity for Racial Inclusion The project has opportunities to advance workforce contracting and inclusion. This project is included in the city’s 2024-2029 Capital Improvement Program (CIP). As of May 10, 2024, project funded for FY2024-2025. Design work is expected to take place in Summer 2024, when funding becomes available. Construction planned to start in the Spring of 2025 and completion in the Fall of 2025 in time for ice season. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Clubhouse / Community Centers

$9,987,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
70
Bidding Soon
1,718
All Active Projects
569
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 1, 2025

September 30, 2025

img_map_placeholder

Multiple Locations, Saint Paul, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.