EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 6, 2024 at 8:00 PM

Updated October 1, 2024

Site work for an educational facility in Honolulu, Hawaii. Completed plans call for site work for a educational facility.

Moanalua High School Telecommunication Infrastructure Improvements The work generally consists of the installation of conduit from outside data cabling handholes to the Intermediate Distribution Frames (IDF) in the school s intra-buildings. This also includes Inside Plant (ISP) pathways from IDF to selected classrooms. Trenching and opening walkways to bury the conduit will be necessary as well as core drilling through walls. The estimated cost is between 500,000 and 2,500,000 Contract Duration 270 Calendar Days Contractor License C13 Surety Bonds - Bid, Performance and Payment - will require an AM Best rating of A-, Class VII or higher. Unless otherwise indicated, questions regarding this solicitation must be directed, via email or phone, to the Contact Person listed. Contact Person: Steven Asaumi Email: steven.asaumi@k12.hi.us , Phone Nbr: 808-307-7701 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DOE Contacts - For questions or clarifications during bidding. Please submit your questions and clarifications via fax simultaneously to: 1. Project Coordinator, Facilities Development Branch NAME: Steven Asaumi TELEPHONE NUMBER: (808) 307-7701 FAX NUMBER: (808) 733-4660 EMAIL ADDRESS: Steven.asaumi@k12.hi.us Design Architect ECS, Inc. NAME: Tim Higa TELEPHONE NUMBER: (808) 591-8181 FAX NUMBER: (808) 591-9098 EMAIL ADDRESS: THiga@ecshawaii.com

Bid Results

Educational

$797,300.00

Public - State/Provincial

Site Work

25

14

12

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
3
Bidding Soon
112
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

December 23, 2024

img_map_placeholder

2825 Ala Ilima St, Honolulu, HI


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Moanalua High School Telecommunication Infrastructure Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.