BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2024 at 8:00 PM

Updated May 23, 2024

This is a service / maintenance or supply contract in Hastings, Nebraska. Contact the soliciting agency for additional information.

"A" Elevation Burner Core Supply at Whelan Energy Center, Unit 2, Public Power Generation Agency, Hastings, Nebraska PPGA will be required to pre-qualify by submitting information concerning their organization, experience, and financial status as requested in the bidding instructions. The PPGA reserves the right to accept the bid which best suits its needs whether the price is the lowest or not, to reject any or all bids, and to waive any informalities. No proposal may be altered, withdrawn or resubmitted within 60 days after the date set for the opening of proposals.

Post-Bid

Power Plant

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
20
Bidding Soon
250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

June 24, 2024

Project location map

100 S Pawnee Ave, Hastings, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.