EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 18, 2024 at 8:00 PM

Updated November 20, 2024

Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.

Modernization of 8 Escalators at Terminal B bridge connector and Terminal C Check in area. Estimated Cost $14,600,000. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Work to be performed under this Contract includes: 1. Phased Modernization of eight (8) escalators - two (2) escalators located at Terminal B, Pier A; two (2) escalators located at Terminal B, Pier B; and four (4) escalators located at Terminal C and denoted as the following Massport/State identification numbers: 1.1. Terminal B, Pier A Escalators B36E/1-E-10653 and B37E/1-E-10654 1.2. Terminal B, Pier B Escalators B34E/1-E-10652 and B35E/1-E-10651 1.3. Terminal C Escalators C8E/1-E-10660, C9E/1-E-10658, C10E/1-E-10659, and C11E/1-E-10657 2. Enabling and ancillary work supporting the escalator modernizations to include but not be limited to: 2.1. Replacement of three (3) stairway doors and frames at Terminal C 2.2. New Electrical power circuits to Terminal B escalators 2.3. Removal and reinstallation of select stainless steel panels for access to escalators components and supports 2.4. Partial removal and reinstallation of select guardrail and handrails components for access to escalator components 3. Temporary work supporting the escalator modernizations to include but not be limited to construction barricades and barriers, related signage and accessories for safe work-zone and pedestrian-areas and wayfinding during the phased construction activities cproctor@depaolimosaic.com electronic mail to CPBidQuestions from (Sender's) email dated 05/21/2024 This contract is subject to a Minority/Women Owned Business Enterprise participation provision requiring that not less than ZERO POINT FOUR PERCENT (0.4%) of the Contract be performed by minority and women owned business enterprise contractors. The work includes CONSTRUCTION SERVICES TO MODERNIZE AND RENOVATE EIGHT (8) EXISTING ESCALATORS LOCATED IN TERMINAL B CONNECTING BRIDGE AND TERMINAL C AT LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MA 02128; DEMOLITION AND RECONSTRUCTION OF SURROUNDING AREAS; ELECTRICAL WORK AND UPGRADE; THE UNITS ARE DESIGNATED AS: (Units B34E, B35E, B36E, B37E, C8E, C9E, C10E, C11E) Work Included: Provide labor, materials and equipment necessary to complete the work of this Section, including but not limited to the following: 1. The preparation and implementation of a Contractor's Health and Safety Plan when there is a potential for employees, the general public or the environment to be exposed to contaminated soil or groundwater. The HASP shall address all activities performed within the Contract including but not limited to soil excavation, dewatering and stockpile management. 2. The Contractor shall develop a detailed HASP using this Section and the site inspection as a basis for delineating additional details and requirements as the Contractor determines necessary. The HASP must detail the protocols necessary for protecting workers, on-site personnel, visitors and potential off-site receptors from potential hazards related to hazardous materials encountered during stockpiling, removing and handling of potentially contaminated soils and groundwater.

Bid Results

Transportation Terminals

$13,292,000.00

Public - State/Provincial

LEED Certification, Renovation

79

26

5

6

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Stainless-Steel Doors and Frames, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
148
Bidding Soon
2,743
All Active Projects
1,134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

January 22, 2025

img_map_placeholder

To Be Determined, Boston, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.