Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 13, 2024 at 8:00 PM
Updated May 17, 2024
This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.
Upgrades to Water Distribution and Transmission Systems for Pressure Districts 1e, 2e, 3, 3e, 4, 4s and 5s. TIMELINE: A Request For Proposals from Engineering Services has been issued by the City of Toronto. The city Requires Professional Engineering Services to Conduct a Study That Will Define Causes, Assess Potential Impacts, and Provide Direction on Mitigation Measures Regarding Hydraulic Transients in the Water Distribution and Transmission Systems. The awarded proponent will Merge and Validate a Hydraulic Water Model for Pressure Districts 1, 1e, 1w, 2, 2e, 3, 3e, 4, 4s and 5s That Will Be Used for Creating a Transient Model for the Study Area for Assessing Adequacy of Existing Surge Protection Devices and Current Operating Strategies of Facilities and the Transmission and Distribution Water Systems. Develop a Monitoring Plan for Collecting Data in the Field Including Continuous Pressure Logging, C-factor Testing, Fire Flow Testing, and Flow Monitoring to Be Used to Validate the Aforementioned Hydraulic Model; to Calibrate and Validate a New Water Transient Model for the Study Area; and to Implement the Monitoring Plan in the Field. Create, Calibrate and Validate a Water Transient Model for the Study Area to Assess Impact and Risk of Transients in the Water Transmission and Distribution Systems, Provide Surge Protection for Future System Conditions to Accommodate Future Population Growth and Expansion of the Water System, and Recommend Schedule and Cost for Capital Implementation of Recommended Protection Measures. Prepare a City-wide Plan for the Installation of Temporary and Permanent Sensors in Facilities and the Distribution and Transmission Watermains to Be Implemented by the City After Completion of the Study. Make a Recommendation for Number of Sensors, Location, Cost and Implementation Stages. Purchase and Installation of Sensors Will Be Done by the City and Will Not Be Part of This Study.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
Bid Date: May 31 2024
Toronto, ON
Bid Date: May 27 2024
Toronto, ON
Bid Date: Jun 11 2024
Toronto, ON
Bid Date: May 31 2024
Toronto, ON
Bid Date: May 28 2024
Toronto, ON
Bid Date: May 22 2024
Toronto, ON
--
Toronto, ON
Bid Date: Jun 04 2024
Toronto, ON
Bid Date: Jun 30 2024
Toronto, ON
Bid Date: May 21 2024
Toronto, ON
Bid Date: May 21 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
