Happy Independence Day

Life, liberty, and the pursuit of better bids.

Buy Now →
BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 15, 2026 at 8:00 PM

Updated June 16, 2026

Renovation of a clubhouse / community center in Windsor, Connecticut. Design plans call for the renovation of a clubhouse / community center.

The majority of HVAC equipment is original to the building circa 1957. Existing air handlers are heating only and they do not provide per codes adequate ventilation on town and BOE sides of building. Phase two includes installation of Variable Refrigerant Flow electric heat pumps, replacement of fin tube radiation, roof exhaust fans, all HVAC equipment on north side of building to be controlled by DDC Controls. The flooring in center core will be abated and replaced. Due to this projects scope size and complexities, it will be completed in four phases. Design completed in FY22. Phase I- FY23 North side Phase II- FY24 North side Phase III- FY25 South side Phase IV- FY26 South side The project is included in the City's 2026-2031 Capital Improvement Program (CIP). As of June 15,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Clubhouse / Community Centers

$2,370,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,006
Active Projects
111
Bidding Soon
6,099
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

599 Matianuck Ave, Windsor, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.