Site work for a water / sewer project in Okatie, South Carolina. Completed plans call for site work for a water / sewer project.

Beaufort-Jasper Water and Sewer Authority (BJWSA) owns and operates the Cherry Point Water Reclamation Facility (CPWRF), which was constructed in 1995 with an initial permitted capacity of 1.10 million gallons per day (mgd). To date, four additional expansions have increased the plant's capacity to its current rating of 7.5 mgd. These expansions were necessitated from consolidating parts of the collection system. Major components and treatment technologies at the facility include multi-rake influent screening, vortex grit removal, equalization storage and pumping, carrousel-style bioreactors, secondary clarification, disk filtering, and UV disinfection. The location of the existing facility is shown in Exhibit 1 and Exhibit 2. BJWSA completed a comprehensive Water and Wastewater Master Plan Update (MPU) in 2017. Since the completion of the MPU, continued development and population growth have accelerated the need for expanded treatment capacity at the CPWRF. An additional Master Plan Update was developed in 2022, which also informed additional growth and flows. Based upon the recommended updates and expansion, as called for in the MPU, it is recommended to increase the permitted capacity of CPWRF to 11.25 mgd. BJWSA has selected Construction Manager At-Risk (CMAR) for the project delivery method. Black and Veatch (BV) has been selected as the consulting engineer, and has carried design responsibilities to date. The construction drawings and specifications as prepared by BV are approximately 90% complete. Offerors are required to comply with BJWSA's procurement code requirements as identified in the RFP. Questions Due Date: May 24th 2024, 4:00 PM EDT

Post-Bid

Water / Sewer

$500,000.00

Public - State/Provincial

Site Work

389

41

13

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
44
Bidding Soon
523
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

September 3, 2024

img_map_placeholder

Cherry Point Rd, Okatie, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.