BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2024 at 8:00 PM

Updated June 11, 2024

Site work, paving and new construction of a bridge / tunnel in Arpin, Wisconsin. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

City: Arpin County: Wood State/Province: WI Site Directions: See Bid Documents You are notified that the Contract Times under the above contract will commence to run on June 14, 2024. By that date, you are to start performing your obligations under the Contract Documents The bidder, if awarded the contract, must complete construction by December 31, 2024 The proposed work consists of furnishing and installing a pre-engineered steel bridge and any incidental items necessary to complete the work.

Bid Results

Bridges / Tunnels

$175,565.00

Public - County

New Construction, Paving, Site Work

8

5

2

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
13
Bidding Soon
453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

June 14, 2024

Project location map

Multiple Locations, Arpin, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.