EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 26, 2024 at 8:00 PM

Updated June 27, 2024

Site work for a mixed-use development in Prescott Valley, Arizona. Completed plans call for site work for a swimming pool; and water / sewer project.

The work consists primarily of installing an emergency backup generator at the site, including all electrical, structural, and site work components and necessary work, staff, materials, and equipment required to complete the project. The Town already owns the generator, which will need to be moved to the Little Pete Well site as part of the project. Each bid shall be accompanied by a certified check, cashiers check, or surety bond for ten percent of the amount of the bid included in the bid proposal as a guarantee that the contractor will enter into a contract to perform the proposal in accordance with plans and specifications. The Town of Prescott Valley reserves the right to accept or reject any and all bid proposals, or any part thereof, to withhold the award, and waive any informality deemed in the best interest of the Town. Project Description / Scope a) This water utility enterprise project involves the addition of a new generator and appurtenances for the existing Little Pete Well. The work consists primarily of installing an emergency backup generator at the site, including electrical, structural, and site work components. This will include the necessary work, staff, materials, and equipment required to complete the project. The Town has purchased and owns the generator, which will need to be transported to the Little Pete Well site as part of the project. New fence installation and plunge pool modifications / expansion per plans. b) Contract documents, specifications and plans may be obtained from the Prescott Valley website at www.prescottvalleyaz.gov/676/Bids-RFQs, www.publicpurchase.com , or by calling the Prescott Valley Utilities Department at (928) 759-3070. c) Potential addenda will be issued if there are any questions or comments unresolved by bid documents. d) Lisa Vaughan, P.E. is the Project Manager for this contract. e) Ben Townsend, P.E., of Civiltec Engineering, Inc. is the Project Engineer for this contract. f) Potential bidders shall have the opportunity to ask questions of the Project Engineer and Town staff. Any interpretation, clarification, or addition to this Bid Proposal Packet and Contract Documents shall be provided in writing by Addendum. The Town and Civiltec will not entertain any questions about the project by phone. All queries shall be forwarded to both the Project Engineer and Project Manager per the

Post-Bid

Water / Sewer

$181,000.00

Public - City

Site Work

12

19

2

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Electrical Cabinets and Enclosures, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Embankments, Roadway Embankments, Erosion and Sedimentation Controls
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
4
Bidding Soon
201
All Active Projects
96
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2024

July 15, 2024

img_map_placeholder

To Be Determined, Prescott Valley, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.