BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2024 at 8:00 PM

Updated June 6, 2024

Site work and paving for a mixed-use development in Anoka, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Rum Riverbank Stabilization at City of Anoka Recreational Easement In general, work consists of the following approximate major quantities (all alternates included): CLEARING AND GRUBBING 0.16 ACRE COMMON EXCAVATION 693 CU YD GEOTEXTILE FABRIC TYPE 7 978 SQ YD ANGULAR RIPRAP CLASS III 665 TON FLEXAMAT STANDARD (12' X 30') 1 ROLL FLOTATION SILT CURTAIN 420 LIN FT SILT FENCE TYPE MS 750 LIN FT SEDIMENT CONTROL LOG TYPE WOOD CHIP 420 LIN FT COMMON TOPSOIL BORROW 126 CU YD ROLLED EROSION PREVENTION CATEGORY 45 356 SQ YD BID ALTERNATE 1 -INSTALL VRSS 225 LIN FT This work shall be subject to prevailing wages and labor standards in accordance with State Funded Construction Contracts. The Bids shall be on the form provided for that purpose and according to the Bidding Requirements. This project will stabilize and protect approximately 400-linear feet of severely eroding streambank along the Rum River in Anoka, MN, reducing pollutant loading, enhancing habitat benefit, and secondarily protecting the public use benefit of a paved walking trail. The riverbank and trail are currently being undermined by erosion and are wasting into the river. The bituminous walking trail will be removed from the project area by the City of Anoka prior to construction. Replacement of the bituminous trail is NOT part of this bid. Site Address: Govt. Lot 1, SW of the Anoka High School Site Directions: From N 7th Ave, turn west on 38th Ave. NW towards the Anoka High School. Continue approximately 2,300 feet west, through the intersection past the high school parking area, and tennis courts. Turn left (south) into auxiliary paved parking lot at west extent of 38th Ave. NW. Riverbank construction site is approximately 700 feet southwest of southwest corner of auxiliary parking lot. There will be a non-mandatory pre-bid meeting held from 10:00 AM to 11:00 AM on Thursday, May 23, 2024 at the project site, City of Anoka Recreational Easement on Govt. Lot 1, SW of the Anoka High School. Park in the auxiliary paved parking lot on to the south at west extent of 38th Ave. NW. Riverbank construction site is approximately 700 feet southwest of southwest corner of auxiliary parking lot. Parking coordinates (paste into Google Maps): 45.222175, -93.386356 Est. Completion Date: Nov. 15, 2024 Question Deadline 05/24/2024

Bid Results

Water / Sewer

$128,627.00

Public - County

Paving, Site Work

17

8

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
0
Bidding Soon
771
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.