Published June 27, 2024 at 8:00 PM
Updated October 1, 2024
Site work and paving for a mixed-use development in Florissant, Missouri. Completed plans call for site work for a educational facility; road / highway; and for paving for a road / highway.
Approximately 10,700 square yards of new asphalt surface will be installed. All work will be completed in 1 trip(s). Work areas will be barricaded for the duration of the project. Rotomill the existing asphalt surface to a depth of 2 inches (2"). All surfaces to be paved will be cleaned using blowers and power brooms. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding.. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. Edges will be tapered and beveled to meet the existing surface. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the director of Maintenace. Southeast Middle School | 2" Mill and Overlay 1. Approximately 13,720 square yards of new asphalt surface will be installed. 2. All work will be completed in 1 trip(s). 3. Work areas will be barricaded for the duration of the project. 4. Rotomill the existing asphalt surface to a depth of 2 inches (2"). 5. All surfaces to be paved will be cleaned using blowers and power brooms. 6. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. 7. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding. 8. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. 9. Edges will be tapered and beveled to meet the existing surface. 10. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the Director of Maintenance.. West Middle School | 2" Mill and Overlay 1. Approximately 12,400 square yards of new asphalt surface will be installed. 2. All work will be completed in 1 trip(s). 3. Work areas will be barricaded for the duration of the project. 4. Rotomill the existing asphalt surface to a depth of 2 inches (2"). 5. All surfaces to be paved will be cleaned using blowers and power brooms. 6. SS-1 will be applied at a rate of .1 gallon to ensure proper adhesion between new and existing asphalt surfaces. 7. Leveling: We will level low and depressed areas by installing tons of asphalt leveling surface. This will raise low areas and minimize water ponding. 8. 2 inches of compacted hot mix asphalt will be machine laid and then rolled using 3-to-5-ton vibratory steel drum rollers. The specified depth is after compaction. 9. Edges will be tapered and beveled to meet the existing surface. 10. The new asphalt areas will be restriped per existing layout or with changes given by Director of Maintenance prior to work, with one coat of traffic paint. All curb stops will need to be re-installed after the lot is striped. Any wheel stops that are found to be in need of repair shall be reported to the Director of Maintenance All work will need to be performed no earlier than July 1, 2024, and be complete by August 2, 2024 The Owner will require the successful bidder to furnish a Performance Bond and Labor and Materials Bond prior to the execution of the contract. The bonds shall be written in the amount of 100 percent of the total contract price All bidders will be required to furnish a bid bond in the amount of 5% of the bid at the time of submission of the bid. The contractor shall provide liability insurance and workers compensation in full until completion of the work. Fire, theft, and windstorm insurance during the work. Fire, theft, and windstorm insurance during the work period shall be provided by the contractor. All vandalism during construction is the responsibility of the contractor. The owner reserves the right to waive informalities in bids and to reject any or all bids. Question Deadline 05/17/2024 at 12:00 PM CT Any questions regarding the specifications are to be directed to Danielle Thomas, Director of Purchasing & Supplier Diversity through the Vendor Registry online question submission process via the district's website at online Only these inquiries will be answered. Any items requiring clarification will be distributed to all known vendors. Interested parties should submit their bid proposal through Vendor Registry via the district's website at online Tuesday, May 21, 2024 not later than 11:00 a.m
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2024
July 17, 2024
Multiple Locations, Florissant, MO
Related To This Project
Florissant, MO
Bid Date: Jul 24 2024
Florissant, MO
Bid Date: Jun 13 2024
Florissant, MO
Bid Date: Jun 10 2024
Florissant, MO
Bid Date: Jul 02 2024
Florissant, MO
Bid Date: Jul 02 2024
Florissant, MO
Bid Date: Aug 08 2024
Florissant, MO
Bid Date: Aug 09 2024
Florissant, MO
Bid Date: Sep 05 2024
Florissant, MO
Bid Date: May 17 2024
Florissant, MO
Bid Date: May 02 2024
Florissant, MO
Bid Date: Apr 04 2024
Florissant, MO
Bid Date: Apr 09 2024
Florissant, MO
Bid Date: Apr 08 2024
Florissant, MO
Bid Date: Apr 09 2024
Florissant, MO
Bid Date: Mar 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.