Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 9, 2025 at 8:00 PM
Updated October 10, 2025
Renovation of a municipal facility in Bloomfield Township, Michigan. Completed plans call for the renovation of a municipal facility.
As of September 24, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Reference Number 0000394834 48th District Court Rooftop Unit Removal and Replacement Question Acceptance Deadline 08/11/2025 10:00 AM EDT Questions are submitted online Yes Questions regarding the bid must be made in writing (letter or email) prior at which time a response will be prepared and forwarded to all vendors. Dean Begley Building & Grounds Maintenance Foreman Bloomfield Township DPW Email: DBegley@bloomfieldtwp.org P: 248-433-7741 F: 248-594-2816 . Bidders shall complete every space in the following specification tables. Every item should be marked with an "X" to indicate the specification is being EXACTLY met or with a description of ANY DEVIATION from the specification. Failure to complete every space on the specification form may disqualify the bidder. Each section of this document is separated and labeled in the top-right header of each page; there is also an index on page 12 to guide through the specifications of different equipment components. Except where noted in "Exceptions," the following bids are in strict accordance with the specifications contained herein. 3.1 Craning of the old unit off and new onto the roof. 3.2 Remove all equipment on the roof area as needed for rooftop unit removal and installation. 3.3 Disconnect necessary plumbing, electrical and ancillary connections for rooftop unit removal. 3.4 Resurface and repair roof as necessary for rooftop unit installationInstall one Trane Model SFHPF204, 460V 3-phase rooftop unit with air conditioning. 3.6 Install new, or re-connect plumbing, electrical and ancillary connections as necessary to complete the system. Connections shall be prepared and connected to industry standards. 4 Rooftop Unit Specifications 4.1 Rooftop Unit shall be a Trane Model SFHPF204 460V 3-phase unit with air conditioning, meeting the following specifications: 4.2 20-ton capacity 4.3 Use R454B refrigerant 4.4 2"-11/2# nominal insulation with Full Solid liners 4.5 0-100% Economizer with comparative enthalpy control & electric actuators 4.6 Microtech III discharge air control (DDC controls, BACnet MSTP Communication) 4.7 Supply and return fan motors mounted on spring isolators 4.8 Hot gas bypass on one circuit 4.9 Single thru-door disconnect switch 4.10 Stainless steel drain pan 4.11 Phase failure Monitor 4.12 Duct smoke sensor 4.13 Field powered GFI receptacle 4.14 Freeze Stat 4.15 4-step compressor capacity control 4.16 2" Disposable MERV 8 filters (One set) 4.17 One-year parts and labor warranty 4.18 Five-year Compressor Warranty 4.19 Mechanical Permit - apply/acquire previous to installation 4.20 Check test and start up 4.21 Labor to complete the above scope of work
Bid Results
Municipal
$133,444.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2025
September 18, 2025
4280 Telegraph Rd, Bloomfield Township, MI
Related To This Project
Bloomfield Township, MI
Bid Date: Aug 28 2020
Bloomfield Township, MI
Bid Date: Jul 16 2024
Bloomfield Township, MI
Bid Date: Aug 20 2024
Bloomfield Township, MI
Bid Date: Aug 27 2024
Bloomfield Township, MI
--
Bloomfield Township, MI
Bid Date: Sep 26 2024
Bloomfield Township, MI
Bid Date: Oct 28 2024
Bloomfield Township, MI
--
Bloomfield Township, MI
Bid Date: Apr 25 2024
Bloomfield Township, MI
Bid Date: May 03 2024
Bloomfield Township, MI
Bid Date: Mar 18 2024
Bloomfield Township, MI
Bid Date: Mar 28 2024
Bloomfield Township, MI
Bid Date: Mar 28 2024
Bloomfield Township, MI
Bid Date: Mar 28 2024
Bloomfield Township, MI
Bid Date: Mar 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
