BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Arcata, California. Completed plans call for site work for a water / sewer project.

The project is located at Mad River Fish Hatchery, Humboldt County, California. The Contractor shall provide all labor, tools, equipment, materials, incidentals, permits and taxes necessary to replace an existing pressure tank with a hydropneumatic tank, install two fire protection tanks, and other miscellaneous work, as outlined in the Items of Work. License Requirements: A or B Estimated Cost: $ 300,000.00 Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 3%. Failure to fulfill the DVBE requirement will render your bid non-responsive. DVBE Incentive: For evaluation purposed only, an incentive will be given to bidders who exceed the 3% DVBE participation requirements. Refer to the Instructions to Bidders. Small Business Preference and Small business Subcontractor participation: A five percent (5%) Small business Preference will be granted to properly certified small businesses (a completed STD 811 must be submitted with the bid proposal). As of March 1, 2015, Senate Bill 854 requires that :No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations. Failure to register with DIR or list sub-contractors not registered will render your bid non-responsive Description: Provide all labor, tools, equipment, materials, incidentals, permits and taxes necessary to replace an existing pressure tank with a hydropneumatic tank, install two fire protection tanks, and other miscellaneous work. For general questions pertaining to the bidding requirements, please contact Engineering at 916-376-8648. For Engineering questions contact Patrick Luster at 916- 224-0463 or Email; Patrick.Luster@wildlife.ca.gov. Construction shall be completed within ONE HUNDRED (100) WORKING DAYS following the official “Notice of Start Date” from the State to the Contractor to commence construction.

Award

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

4

6

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
34
All Active Projects
12
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.