BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Saint Louis, Missouri. Completed plans call for the construction of a playground / park / athletic field; for site work for a 131,368-square-foot playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

1. Purpose of Project. Scope is to provide the construction of a new community park on parcels owned by the City of Ferguson at 9315 W Florissant Ave. The new park will be adjacent to the future Great. Rivers Greenway (GRG) District's Maline Greenway Corridor. While the Maline Greenway and the West Florissant Community Park Projects are expected to benefit each other mutually, it is essential to recognize that they are separate projects. The new community park will be located south of the proposed greenway and north of the Maline Creek. A portion of the new Community Park is in a floodplain. Key program elements include, but are not limited to: a. Multi-purpose pavilion (with lighting) b. Unisex Public Restroom with Drinking Fountain c. Parking Lot for 16 vehicles d. Food Truck Plaza e. Strolling Path with designated picnic areas f. Grill Stations g. Outdoor Seating h. Bicycle Repair Station and Bicycle Racks i. Native Planting j. Stream Bank Plantings k. Emergency Call Station l. Pedestrian Site Lighting m. Vehicular Parking Light Fixtures. n. Litter Receptacles and Dog Waste Bag Dispenser 2. Purpose Scope of Work a. Demolition Activities. trees, curb, sidewalk, and driveway entrance.) b. Elements of construction include new: sidewalks, curb and gutters and a new driveway approach. A prefabricated restroom, prefabricated pavilion, installation of site furnishings, and strolling path are also proposed. The site includes curb replacement and new concrete parking lot pavement striping. As an alternate bid, Contractor may provide an asphalt parking lot and or asphalt walking path. Construction also includes the placement of a sewer pipe to catch runoff from the site. The site will include the installation of native plant material. To the North of the park area will be the soon-to-be-constructed Maline Greenway by Great Rivers Greenway (GRG). 3. Size of project. is 3.01 acres. 4. Current Occupancy Use. Unused 5. Other significant aspects of the work. A portion of the site perimeter will be enclosed with a 42" high chain link fence. 6. Other major aspects of the work. Site perimeter will be enclosed with a 4-0' high chain link fence. A muti-use path with lighting is proposed for meandering through the site. The City intends to issue the Notice to Proceed for this work in June 2024. All inquiries or contacts related to this RFP are required to be made exclusively through Joseph Seastrom, Director of Parks and Recreation by email at jseastrom@fergusoncity.com The City reserves the right to reject any or all bids and to waive any irregularities in the best interest of the City. All inquiries or contacts related to this RFP are required to be made exclusively through Joseph Seastrom, Director of Parks and Recreation by email at jseastrom@fergusoncity.com.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Paving, Site Work

48

17

11

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
98
Bidding Soon
1,493
All Active Projects
642
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 7, 2024

July 8, 2024

img_map_placeholder

9401 W Florissant Ave, Saint Louis, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.