BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2024 at 8:00 PM

Updated July 14, 2024

Site work for a water / sewer project in Saint Louis, Missouri. Completed plans call for site work for a water / sewer project.

Update, 31 May 2024: Responses to pre-award RFI added to attachments. The contractor shall furnish all labor, equipment, and tools necessary to perform the repair work for the replacement of the existing backflow preventer assembly. The backflow preventer assembly has failed the St. Louis County annual testing and needs to be replaced. The existing backflow preventer is in a below ground level valve pit/vault and is located in the West Parade Field of Jefferson Barracks Air National Guard Station (JB ANGS). This is one of two (2) backflow prevention assembly systems for the domestic water service at JB ANGS. Contractor shall be a licensed plumber in St. Louis County. See attachments for project details. In accordance with FAR 36.211(b), the following information is provided: The National Guard has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts other than those described at FAR 43.204, DFARS 243.204 and AFARS 5143.204. Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the National Guard is currently not available, but will be compiled and provided in future announcements. Disclosure of Magnitude in accordance with FAR 36.204: less than $25,000. Question Deadline 05/31/2024 Any requests for information (RFI) or question regarding this solicitation and attachments shall be submitted via email to the POCs above no later than 5 business days (POC): MSgt Joe Bernier Email: joseph.bernier.1@us.af.mil Phone: (314) 527-8033 Alternate POC: SMSgt Mark Phillips Email: mark.phillips.18@us.af.mil Phone: (314) 527-8031

Award

Water / Sewer

$39,420.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
98
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

July 8, 2024

Project location map

29 Sherman Ave, Saint Louis, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.