BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 11, 2025

Site work for a civil project in Marion, Indiana. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

This work shall consist of furnishing an electronic material delivery ticket, e-ticket, and delivering the e-ticket to the Departments e-ticketing portal, MyDOTportal, in accordance with 105.03. Project Control No. 2100768, 2100769 Federal/State No. 2100768, 2100769 Small Structure Pipe Lining Cv I69-027-271.46 Culvert Grant County - on I-69 Over Mckee Ditch, 7.32 Miles North Of Sr 18 Small Structure Pipe Lining Cv I69-027-269.98 Culvert Grant County - on I-69 Over Lee Butler Ditch, 5.84 Miles North of Sr 18 Completion Date: September 30, 2026 Qualifications: E(E) All Bidders Must Be Prequalified and Have Proper Qualifications and Bidding Capacity. An Executed Bid Bond Shall Be Included With All Bids. Only Electronic Bid Bonds Submitted Through the Designated Electronic Medium, Either Surety2000 or Tinubu Surety Solution, Will Be Accepted With the Bid. A Fully Executed Performance Bond Shall Be Included With All Bids, Except on Contracts for Roadside Mowing, Vegetation Control, Demolition, Landscaping, Fencing, Seeding and Sodding, Bridge Painting, and Guardrail Installations of $100,000 or Less, When the Bidder May Elect Not to Furnish a Performance Bond. Electronically Does Not Support Submittal of the Performance Bond. The Performance Bond Must Be Submitted to the Construction Letting Email Inbox or Be Delivered on Paper by the Time Set for Receipt of Proposal Bids. Each Contractor That Submits a Proposal Bid in the Amount of $150,000 or More for Highway Improvements Described in This Notice is Required to Submit With That Bid a Written Plan for a Program to Test the Contractor's Employees for Drugs. The Plan Shall Be in Compliance With Indiana Code 4-13-18. The Plan Must Be Submitted to the Construction Letting Email Inbox or Deposited With the Indot Engineer by the Time Set for Receipt of Proposal Bids. INDOT - 230 - Small Structure Pipe Lining - I 69

Post-Bid

Bridges / Tunnels

$1,382,634.00

Public - State/Provincial

Site Work

14

11

2

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
101
Bidding Soon
1,658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2025

February 9, 2026

Project location map

I-69, Marion, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.