EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2024 at 8:00 PM

Updated October 1, 2024

Remodeling and renovation of a military facility in Philadelphia, Pennsylvania. Completed plans call for the remodel of a military facility.

This is a Design-Build (DB) construction to replace all exterior windows of Building 6 at NSAP with energy efficient windows. The window replacements will be completed in-kind where the new material will duplicate the material, dimensions, and detailing of the existing non-significant replacement windows. The original window openings will retain their original size and shape. The proposed action is required to increase energy efficiency of the building. The general scope of work and requirements for this task order includes - but is not limited to: 1. Provide a life cycle cost analysis (LCCA) to select windows and glazing with the best possible performance for: a. U-factor b. Solar Heat Gain Coefficient (SHGC) c. Daylighting d. Visible Transmittance 2. Provide heavy-duty commercial quality aluminum windows conforming to AAMA/WDMA/CSA 101; must have anodized aluminum finish with color to match previous existing windows or meet the applicable installation exterior architectural guidelines. 3. Windows must match size (height x width) of existing windows being replaced and must fit in existing clear openings; provide required anchoring, new blocking, shims, metal/wood furring, sealants, weather-stripping, etc. for a secure, air & weather-tight fit in the clear opening. All window openings are to be secured and weather-tight during non-working hours. 4. Provide glazing that minimizes hazardous glazing fragments, per UFC 4-010-01 (DoD Minimum Antiterrorism Standards for Buildings). 5. Provide insulated glazing system (outer lite low E with air space (argon) and interior lite meeting IBC requirements for wind and windborne debris protection). 6. Windows must match color of previous existing or comply with IAP (Installation Appearance Plan); tint of glazing to match previous existing location. 7. Seal all window rough openings to prevent water & air infiltration after new window installation; final installation must adhere to air leakage rate in accordance with guide specifications (UFGS) and NFRC (National Fenestration Rating Council). 8. Windows to allow operable (outward awning type, per existing) use, where applicable, with locking or latching hardware. Insect screen is to be mounted on inside of frame of operable portion of window and must be removable. 9. Window removal and replacement work may cause damage to interior finishes or may require destruction to accommodate work; Contractor to anticipate rework will be required to restore these conditions to new; all new finishes (gyp bd, plastic laminate or wood sills, ceiling soffit conditions, etc.); materials are to match existing adjacent material, color, and texture. 10. Interior access will likely be required to perform work; interior relocation or removal of systems furnishings (cubicles, etc.) should be anticipated - see reference drawings in Part 6 (contractor to confirm during site visit)

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

8

8

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Carpeting, Wall Finishes
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Hooks, Lifts

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
288
Bidding Soon
4,602
All Active Projects
1,963
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2024

July 3, 2024

img_map_placeholder

700 Robbins St, Philadelphia, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Windows

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.