Renovation of a municipal facility in Newberry, South Carolina. Completed plans call for the renovation of a municipal facility.

As of September 4, 2024 this project was awarded to Lewis Communications But the awarded amount is not available Newberry County is requesting proposals for the reworking of the network cabling in the Newberry County Courthouse, 1226 College Street, Newberry, SC. Funding will be provided by the 2022 CPST Referendum. Project will require new CAT6 ethernet cable to be run from each red and blue dot location marked on the blueprints provided to the third-floor room notated as 303/300. All network cable runs will need to go to a punch block. All ports must be numbered on the punch block and wall jack and tested. Punch blocks and rack to be provided with proposal. Drawings are included for each floor indicating the locations for the proposed cabling. Existing fiber connections and four CAT6 connections must be ported to the 3rd floor rack (303/300). The current fiber location is in a sub-level room below the basement floor level notated on basement floor blueprint as electrical A103. A six-strand fiber will be fine. Current connections on the second floor must remain in place, and the new network cable runs and plates must be installed from red dot marks on blueprint to 3rd floor 303/300. Connections on the first floor and basement level offices can be replaced or a new CAT 6 cable and jack can be installed, leaving this option open to the vendor. The blue dots marked on the blueprints designate the locations for our current security cameras. A new jack and CAT 6 cable run will need to be installed to go from each blue dot to the 3rd floor punch block at 303/300. Current cabling for cameras must remain in place. Some camera connections may be at a higher height on the wall (closer to the ceiling). There are a couple of new spots designated for future cameras. A few offices have a security camera at their door. These door security devices will need to have their connection stay in place with a second new connection running to the third floor. The following must be provided with proposal: A cost per run for any additional runs that may need to be added during installation that is not currently shown in the blueprints provided. The rack will need to accommodate the punch blocks, 3 switches, and one Firewall with room for expansion. A 42U unit or floor standing rack is preferred. Cable run totals below include all red and blue dots shown on the 4 blueprints provided. Rack and Punch blocks to accommodate at least 240 ports. Cat 6 Patch cables220 @ 1' foot, 100 @ 7 feet, 20 @ 10' feet, 10 @ 15' feet. New wall plates and CAT6 jacks for all connections 6 strand fiber and 4 Cat 6 ethernet cables to go from A103 to 303/300 Cable run totals Basement 54, First floor 117, Second floor 48, Third floor = 2 Total CAT 6 cable runs on all floors = 221 Question Deadline 06/06/2024 at 5:00 PM ET Feel free to contact Crystal Waldrop via email at cwaldrop@newberrycounty.gov if any questions arise. Every request for such interpretation should be in writing addressed to Crystal Waldrop, Procurement Director.

Award

Municipal

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

12

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
155
Bidding Soon
1,838
All Active Projects
829
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 18, 2024

July 18, 2024

img_map_placeholder

1309 College St, Newberry, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.